Dettalji ta’ sejħa għall-offerti ppjanata

It-titlu:
Renewal high voltage installation
L-Awtorità li Qiegħda Toħroġ il-Kuntratt:
European Commission, Joint Research Centre - Geel (JRC-GEE)
Id-Data tal-Bidu:
15/07/2020
Data ta’ skadenza biex tesprimi interess:
16/08/2020
L-istatus:
Magħluq
Tagħrif
JRC/GEE/2020/MVP/1839-ExA
Renewal high voltage installation
Please note that this is not a call for tenders but a publication announcing the Contracting authority’s intention to publish a future negotiated low or middle valueprocedure.

Due to a mandatory risk assessment made (Royal Decree 2012), a total renewal of the high voltage installation in building 100 is highly recommended. This procedure includes the delivery, installation and commissioning of a high voltage cabinet (HV cabinet) for energy supply to this building. After the change, the existing HV room must be disassembled and removed from the site. The new HV cabinet must be installed in a prefab that complies with the requirements of SYNERGRID.
Xogħlijiet
Proċedura ppjanata nnegozjata għal kuntratti ta’ valur medju/baxx
Magħluq
Mhux ivverifikat
L-iktar prezz baxx
45315400
BE213
Additional CPV Supplementary CPV
31321300
31682300
45315400
Miri li Jridu Jintlaħqu
15/07/2020 00:00
16/08/2020 23:59
18/08/2020
Il-lottijiet Is-Sejħa għall-Offerti m'għandha l-ebda lott.
Avviżi Nothing found to display.