Call for tenders' details

Title:
Substance identity (SID) in REACH. Analysis of SID and substance sameness of com...
Contracting authority:
European Commission, DG for Internal Market, Industry,Entrepreneurshipand SMEs (...
TED publication date:
31/12/2013
Time limit for receipt of tenders:
18/09/2013
Status:
Closed
Show filter parameters

Results per page: 10 | 25 | 50 13 Questions found, displaying 1 to 10.[First/Prev] 1, 2 [Next/Last]
# Question Answer Last publication date Status
13
As part of the “Administrative” part of the offer for private and public entities EC does require as [...]
Proof should be provided, that the person signing the tender is legally authorised to do so. After the [...]
16/09/2013
12
Does the tenderer need to send in, at the moment of sending in the tender, a signed version of the I. [...]
The contract is only made after the award decision is published. Both parties will sign the contract [...]
16/09/2013
11
On the pages 1 & 2 of the Service Contract for this tender, the Contract number needs to be mentioned [...]
The contract number will be assigned by the Commission at a later stage of the procedure. The draft contract [...]
16/09/2013
10
On the page 4, of the Service contract, under Art. I.6, it is requested the name of the data controller [...]
For the purpose of Article II.6 of the contract, the data controller shall be the unit ENTR/F1 REACH. [...]
16/09/2013
9
Can you give information on the type of classification system asked for on page 8?
Task 2 requires to carry out an exhaustive SID analysis of all selected substances. In this analysis, [...]
06/09/2013
8
Does the contractor have access to the (confidential parts) registration dossiers through REACH-IT for [...]
In principle, it is considered not necessary to have access to REACH-IT information to carry out Task [...]
06/09/2013
7
Can an indication of the proportion of the contract which we envisage to subcontract be made within the [...]
The proportion of the contract to be subcontracted should certainly be included in the technical proposal [...]
28/08/2013
6
One of the documents required as evidence of the technical capacity is „a description of the measures [...]
The 'description of the measures employed to ensure the quality of services' can be provided in the format [...]
28/08/2013
5
As evidence of the economic and financial capacity, several documents, specified in points 5.2.2 a) to [...]
The form Annex 6.4 can be filled in (in full) instead of providing the documents specified in 5.2.2 a [...]
28/08/2013
4
One of the selection criteria is „Sufficient economic and financial capacity to guarantee continuous [...]
There are no specific thresholds for these performance indicators, other than the general indicator that [...]
28/08/2013