Call for tenders' details

Title:
Follow-up actions on the communication on sustainable construction.
Contracting authority:
European Commission, DG for Internal Market, Industry, Entrepreneurship and SMEs...
TED publication date:
16/08/2012
Time limit for receipt of tenders:
02/10/2012
Status:
Closed
Show filter parameters

Results per page: 10 | 25 | 50 16 Questions found, displaying 1 to 10.[First/Prev] 1, 2 [Next/Last]
# Question Answer Last publication date Status
16
In reference to the table in point 4.2.5. Section five: financial proposal, please indicate us what you[...]
'Other' costs refer to travel, subsistence and shipment expenses directly connected with the execution[...]
13/09/2012
15
The meetings of the High Level Forum and the three thematic groups will be simultaneously translated [...]
The Commisssion will propose English as a working language for the Forum and the thematic groups. If [...]
13/09/2012
14
Range of indicators for the five key objectives of the strategy: How many indicators are required? Is[...]
Tenderers are invited to consult chapter 6 (pages 136 to 157) of the study "Sustainable competitiveness[...]
12/09/2012
13
Is there already a list of existing networks/groups at EU and national level as well as policy developments[...]
Tenderers are invited to consult the various studies financed out by the Commission in the field of construction[...]
12/09/2012
12
Information on good practices from Member States: Is there a minimum number of good practices to collect[...]
Good practices should cover at least 4 domains (some examples are given in the tender specification at[...]
12/09/2012
11
Background documents and discussion papers for the High Level Forum on specific themes of the strategy[...]
While the precise needs of the High Level Forum will be identified by the Forum itself, the Commission[...]
12/09/2012
10
“Providing high level of expertise to support the setting up of the governance structure with Member [...]
Senior staff of the contractor shall have a very good knowledge of the construction sector, excellent[...]
12/09/2012
9
Meetings: How many people will attend the High Level Forum (Commission, Member states and sectorial representatives[...]
The composition of the Forum and of the thematic groups should reflect a balanced representation of competences[...]
12/09/2012
8
How many people will participate in the Forum and the thematic groups?
The composition of the Forum and of the thematic groups shall reflect a balanced representation of competences[...]
05/09/2012
7
In the call for tender the offeror is required to maintain a close working relationship with the responsible[...]
Please refer to point 2.5 of the specifications concerning the place of performance. There is no need[...]
05/09/2012