Call for tenders' details

Title:
Project to extend and modernise the Konrad Adenauer Building in Luxembourg - lot...
Contracting authority:
European Parliament, DG Infrastructure and Logistics (INLO)
TED publication date:
06/05/2016
Time limit for receipt of tenders:
14/07/2016
Status:
Closed
Show filter parameters

Results per page: 10 | 25 | 50 44 Questions found, displaying 1 to 25.[First/Prev] 1, 2 [Next/Last]
# Question Answer Last publication date Status
44
Hello. On 28 June 2016 we received a letter stating that the procedure concerning the lots 564 and 77 [...]
The notice of non-attribution has been published on 7th July 2016 in the JO/S S129 under the number 231200 [...]
12/07/2016
43
Is it possible to obtain the documents for lots 561/562/59/77 in Italian ?
No, the official working language for the project is French, as stated in item 3 of the guide. The French [...]
04/07/2016
42
On page 4 of the german Translation of the ITEM DESCRIPTION for Lot 59 T2 "FACINGS", we would like to [...]
Description of implementation according to Article 1.1, page 4/17 (KAD____-10ARE002_____-CA14-059-DCE-DB-BPE [...]
02/07/2016
41
In order to allow us to provide an offer of high technical and economical Quality, we request the postponment [...]
The European Parliament cannot meet your request. In Addition, companies are informed that a notice to [...]
02/07/2016
40
1-Bureau 12p - Monitor 65" What type of support will be provided? Column Full height (floor-to-ceiling [...]
Companies are informed that a notice to annul lots 564 and 77 will be published shortly.
02/07/2016
39
This item is not contained in the Items Description. Please add the details for the item and resubmit [...]
A numbering error was detected in CA14 of Lot 561. Please take this numbering into account for Chapter [...]
02/07/2016
38
This table sets out the door furniture fittings; but there are a number of question marks after the file [...]
You are referred to the attached list of doors, section DD (KAD____-06TPP________-PA01-001-EXE-DD-BPE [...]
02/07/2016
37
The following plans could not be found or were not contained in the documents we received: KAD____07AMM040 [...]
See detailed plan KAD____-07___001_____-TB01-562-EXE-CB-BPE in G. Questions-Réponses 2
02/07/2016
36
In the following items, the fire protection requirements in the preliminary remarks differ from those [...]
The following sets out the requirements per position listed in the question: Pos. 2.5.1 TYPE 02, Powder-coated [...]
02/07/2016
35
Manufacturers of doors and fittings only offer extended warranties at the end of a maintenance contract [...]
The invitation to tender does not include a maintenance contract. Pursuant to Article 1(7)(10) of Annex [...]
02/07/2016
34
Which documents should be certified locally? Which documents are allowed in which language? Are certificates [...]
For general queries, please refer to the construction site manual CP__-130730-BG02-000-CC (D_CCH+Annexes [...]
02/07/2016
33
Is there any information on which versions of MS-Office and CAD tools will be used?
Please refer to Chapter 2.3 of the CAD/CAFM Directive, reference: CP__-140604-BD07-004-CD (D_CCH+Annexes [...]
02/07/2016
32
Will employees require additional security checks in order to be able to work in a building of the European [...]
Construction site personnel work on a construction site that is not subject to constraints linked to [...]
02/07/2016
31
How high are additional building costs, such as electricity, water, insurance, etc.?
See the chapter on the pro-rata account in Annex 5.3 of the tender file. Reference: CP__-140604-BD15- [...]
02/07/2016
30
How many construction meetings do you plan to hold per week and what is the timeframe for these? We require [...]
It depends on the phase: preparation of construction site, works, checks, preliminary operation before [...]
02/07/2016
29
After the last tender was cancelled, it was promised that budgets for each batch would be established [...]
29. The contracting authority is not obliged to provide operators with an estimate of the value of the [...]
02/07/2016
28
From the specifications related to the creation of CAD drawings and documentation, it is clear that standard [...]
The workshop plans can be grouped by type. The interfaces for coordinating the work must be made apparent [...]
02/07/2016
27
The separate tendering of lots means that works management costs must be calculated separately and these [...]
27. Project management will manage the works and the European Parliament will pay for this, including [...]
02/07/2016
26
Workshop plans: You require workshop planning to be fully coordinated with construction office planning [...]
26. The workshop plans can be grouped by type. The interfaces for coordinating the work must be made [...]
02/07/2016
25
All certificates and expert reports required by the law of Luxembourg must be presented in order to prove [...]
A definitive, exhaustive answer cannot be provided to the question, as a list of positions linked to [...]
02/07/2016
24
According to CTGP Point 0.1.2, ‘AS-Built’ documentation will be produced. Please provide further details [...]
24. The composition of the ‘as-built’ file is described in Annex 2 of the tendering specifications, in [...]
02/07/2016
23
According to the specifications, all doors will receive a lock with a stainless steel plate and stainless [...]
All hardware must be made from AISI 304 stainless steel with a satin or brushed finish.
02/07/2016
22
The specifications on the size of tubes for fire doors in plasterboard walls are calculated by the fire [...]
It is imperative that works are coordinated, as specified in Chapter 1.7, on coordinating works, of Annex [...]
02/07/2016
21
According to the specifications, the cost of every 5 soundproofing certificates for various types of [...]
The test protocols must be proposed by the contractor and approved by project management. The protocols [...]
02/07/2016
20
How will payment be paid if it takes more than one attempt to install the lever handles and door closers [...]
Please refer to paragraph 1(3)(7). Time schedule for Annex 2 KAD____-10ARE________-CA13-000-DCE-CD-BPE [...]
02/07/2016