22
Regarding the point 4.2.1, section a) of the tender specifications. If our entity is already registered [...]
As stipulated in the section 4.2.1 of the tender specifications economic operators already registered [...]
28/06/2013
Answered
21
Regarding the point 2.6. Subcontracting. Does the contractor has to provide the form Annex 6.5 filled [...]
In case of subcontracting activities, as defined at the point 2.6 of the tender specifications, it is [...]
28/06/2013
Answered
20
On p.34 related to evidence for technical and professional capacity, we have to provide "e) an indication [...]
The tenderer may demonstrate his technical capacity regarding 'quality control' by providing the EC with [...]
25/06/2013
Answered
19
Are we required to prepare the coaching offer on a number of themes selected by us that we deemed suitable [...]
The 'coaching'/support needs to be tailored according to the needs of the project partners who prepare [...]
24/06/2013
Answered
18
The addendum to the specifications state for WP7 that "The contractor will need to take into account [...]
For both work packages 6 and 7 the contractor will have to bear the travel and the subsistence expenses [...]
24/06/2013
Answered
17
In relation to the conference costs could you please clarify if the costs should also cover the travelling [...]
For both work packages 6 and 7 the contractor will have to bear the travel and the subsistence expenses [...]
24/06/2013
Answered
16
Could Enterprise and Industry kindly confirm whether for WP7 the Commission envisages the conference [...]
It is not envisaged that the conference takes place in a Commission venue. Hence, the cost of a private [...]
21/06/2013
Answered
15
On page 7 of the Technical Specifications there are mentioned 4-6 workshops. Questions: 1.Is the tenderer [...]
1.Yes, the tenderer is expected to propose an exact number of workshops. 2.The organisation of the workshops [...]
18/06/2013
Answered
14
With reference to Work Package 5, on page 9 the Tender Specifications mention that the deliverable "Working [...]
No, the tender specifications in 1.3. state that only one (statistical) Working Paper needs to be drafted [...]
18/06/2013
Answered
13
Under Work Package 3, the tender specifications refer to the document "Developing an Evaluation and Progress [...]
Work package 1 states: “The contractor is requested to develop a monitoring and evaluation methodology [...]
18/06/2013
Answered