Call for tenders' details

Title:
Service contract for further development of EU water balances at sub-catchment l...
Contracting authority:
European Commission, DG ENV+CLIMA
TED publication date:
30/03/2013
Time limit for receipt of tenders:
21/05/2013
Status:
Closed
The deadline to download documents of this call for tenders has been reached. The download of documents is not possible The deadline to download documents of this call for tenders has been reached. The download of documents is not possible
Show filter parameters

Results per page: 10 | 25 | 50 15 Questions found, displaying 1 to 10.[First/Prev] 1, 2 [Next/Last]
# Question Answer Last publication date Status
15
Is additional modelling (1D, 2D, 3D) of water balance parameters (e.g. river discharge, sub-surface flow[...]
As mentioned page 13 of the technical specifications, the tenderer should describe the procedure to reconstruct[...]
13/05/2013
14
What is the required resolution for the water balances? Are they to be submitted on sub-basin level ([...]
Water balances have to be produced at sub-basin level. Shape files from the previous contract, ECRINS[...]
13/05/2013
13
Can we obtain the ecological and chemical status of the sub-basins from the WFD?
All available data on ecological and chemical status from WFD reporting and from SoE process will be [...]
13/05/2013
12
Is it possible for the client to estimate the percentage of water balance data that is still missing [...]
This depends on the parameter. Please refer to the EEA report to WFD-CIS Strategic Coordination Group[...]
13/05/2013
11
The former contracts/pilots only provided only 8 years of water balances while the objective was to report[...]
The calculation of water balances was done for an average of 8 years because of insufficient data either[...]
13/05/2013
10
Please provide additional insight in to the amount of work that is to be expected to make the databases[...]
The objective of the tender and the tasks are clear and cannot be modified. The gaps are precisely described[...]
13/05/2013
9
In the tender specifications it is specified on page 13 under task 2 sub 1: "The contractor should revise[...]
As mentioned in the tender specification some inconsistencies with the water bodies between Ecrins and[...]
13/05/2013
8
Aside from the existing databases, can we also make use of the instruments (like NOPULU System and AQUATOOL[...]
The mentioned tools were used by former contractors for the production of water accounts. The tenderer[...]
13/05/2013
7
Which basins from part of the group ‘best documented basins’ for which at least it is required to produce[...]
the question raise concerns on the proper understanding of what is required in the technical specifications[...]
13/05/2013
6
Do the water balances have to be produced on sub-basin level and then being aggregated to basin level[...]
Water balances have to be produced at sub-basin level, enabling further aggregation at river basin district[...]
13/05/2013