37
|
Tab ‘4 sockets Standard’ and ‘4 sockets Advanced’ Line 18 to 20 in these tabs state: Storage bays Proposed [...]
|
a- Yes, we confirm. The proposed 4 sockets standard and advanced configurations must support at least [...]
|
23/03/2017
|
|
36
|
Tab ‘2 sockets Advanced’ After the recent modifications in the requirements, line 20 to 22 in this tab [...]
|
a- The installed disks are for the Operating System installation and RAID is required. A dedicated controller [...]
|
23/03/2017
|
|
35
|
Tab ‘Common Mandatory’ Line 41: Please provide the complete datasheet of the proposed server configurations [...]
|
a- By 'use cases' we mean the 5 proposed configurations for Lot 1. b- Yes.
|
23/03/2017
|
|
34
|
about the formula ((Summary!B4+Summary!B5+Summary!B6+Summary!B7+Summary!B8)*2*B4), If we add total volume [...]
|
a- The volumes are indicative. The 'Volume/Quantity of Media' for both sanitizations (Basic and High) [...]
|
23/03/2017
|
|
33
|
When EC writes "… This service will be payable per person hour. Column "Price per intervention"", The [...]
|
a- Indeed. Cell B15 of the "Moves and EWH" tab in 'Lot 1 Annex 6 – Financial Evaluation Questionnaire [...]
|
23/03/2017
|
|
32
|
When EC writes "At the option of the EUIs, this feature could be requested to the Contractor as an add-on [...]
|
a- The 'Call-Home' service has been cancelled for both Lot1 and Lot2. The 'DCCS Annex 4 – Service Level [...]
|
23/03/2017
|
|
31
|
When EC writes "Upon request of the EU Institution, the Contractor will perform moves of servers within [...]
|
a- Please note that a 'move' is not a 'professional service', so it must be quoted separately. See the [...]
|
23/03/2017
|
|
30
|
When EC writes "Configuration of hardware and installation of operating systems: Factory integration [...]
|
a- See Answer N° 29 a: The 'Annex 8 to the SLR: Logistics Checklist' document should not be considered [...]
|
23/03/2017
|
|
29
|
a- When EC writes "Assembly of Hardware and Functional test (DoA): Assembly is always included The installation [...]
|
a- The 'Annex 8 to the SLR: Logistics Checklist' document should not be considered as this is only a [...]
|
23/03/2017
|
|
28
|
Subcontractors need to fill in the DoH, yet they should not sign these two sections, which point to the [...]
|
Please keep the document as is, and indicate "N/A" when that question or section is not applicable.
|