Call for tenders' details

Title:
DIGIT/R3/PO/2016/020 - Data centre compute solutions (DCCS).
Contracting authority:
European Commission, DG Informatics (DIGIT)
TED publication date:
28/02/2017
Time limit for receipt of tenders:
24/04/2017
Status:
Closed
Show filter parameters

Results per page: 10 | 25 | 50 157 Questions found, displaying 121 to 130.[First/Prev] 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16 [Next/Last]
# Question Answer Last publication date Status
37
Tab ‘4 sockets Standard’ and ‘4 sockets Advanced’ Line 18 to 20 in these tabs state: Storage bays Proposed [...]
a- Yes, we confirm. The proposed 4 sockets standard and advanced configurations must support at least [...]
23/03/2017
36
Tab ‘2 sockets Advanced’ After the recent modifications in the requirements, line 20 to 22 in this tab [...]
a- The installed disks are for the Operating System installation and RAID is required. A dedicated controller [...]
23/03/2017
35
Tab ‘Common Mandatory’ Line 41: Please provide the complete datasheet of the proposed server configurations [...]
a- By 'use cases' we mean the 5 proposed configurations for Lot 1. b- Yes.
23/03/2017
34
about the formula ((Summary!B4+Summary!B5+Summary!B6+Summary!B7+Summary!B8)*2*B4), If we add total volume [...]
a- The volumes are indicative. The 'Volume/Quantity of Media' for both sanitizations (Basic and High) [...]
23/03/2017
33
When EC writes "… This service will be payable per person hour. Column "Price per intervention"", The [...]
a- Indeed. Cell B15 of the "Moves and EWH" tab in 'Lot 1 Annex 6 – Financial Evaluation Questionnaire [...]
23/03/2017
32
When EC writes "At the option of the EUIs, this feature could be requested to the Contractor as an add-on [...]
a- The 'Call-Home' service has been cancelled for both Lot1 and Lot2. The 'DCCS Annex 4 – Service Level [...]
23/03/2017
31
When EC writes "Upon request of the EU Institution, the Contractor will perform moves of servers within [...]
a- Please note that a 'move' is not a 'professional service', so it must be quoted separately. See the [...]
23/03/2017
30
When EC writes "Configuration of hardware and installation of operating systems: Factory integration [...]
a- See Answer N° 29 a: The 'Annex 8 to the SLR: Logistics Checklist' document should not be considered [...]
23/03/2017
29
a- When EC writes "Assembly of Hardware and Functional test (DoA): Assembly is always included The installation [...]
a- The 'Annex 8 to the SLR: Logistics Checklist' document should not be considered as this is only a [...]
23/03/2017
28
Subcontractors need to fill in the DoH, yet they should not sign these two sections, which point to the [...]
Please keep the document as is, and indicate "N/A" when that question or section is not applicable.
23/03/2017