Results per page: 10 | 25 | 50 11 Otázky found, displaying all Otázky .
# Otázka Odpověď Datum posledního zveřejnění Stav
11
Can we submit scanned copies of the signed Annexes (Annex 1-3) and supporting documents (e.g. annual [...]
As indicated in paragraph 2 of the invitation letter, the tender has to be submitted in one original [...]
02/10/2017
8
Is the comparison of the legislation and safety upgrades limited to changes that have been made directly [...]
Please disregard the answer incorrectly published on 27/09/2017. The correct answer is as follows: No [...]
28/09/2017
10
Is there a list of documents related to Directive Articles 8a-8c including the way that the requirements [...]
No. Information from various different sources on these topics as mentioned in section 2.6 is generally [...]
27/09/2017
9
What role would be expected from the contractor in arranging the two workshops required in Work Package [...]
The contractor is expected to organise the workshops as described in section 2.6.
27/09/2017
7
Evidence A1 must provide references from the projects. Is it asking for the details of the projects: [...]
As described in 4.2.4, the tenderer should provide references for three projects delivered in these fields [...]
27/09/2017
6
Would it be acceptable to seek information from the EU Member States using a questionnaire? In similar [...]
Yes.
27/09/2017
5
The Tender documents are available in PDF format only. Could you please provide us with Annex 1 "Identification [...]
The Annexes 1, 2 and 3 have been added in Word format in the Document Library
26/09/2017
4
-Is it a fix price tender i.e. 300K£€?
This is a competitive tender. As indicated in Part E ‘Financial offer’ in section 1.6. of the tender [...]
26/09/2017
3
-Section 2.5 describes the scope of the tasks: A detailed survey and technical evaluation is needed for [...]
The level of detail to be provided for the category of nuclear installations mentioned in the tender [...]
26/09/2017
2
-In section 4.2.4. from the tender specifications, it says that support team (B4) should have at least [...]
This period applies to whole team.
26/09/2017
1
In the Tenders Specification, the links in section 1.7 to the Legal Entity Form and to the Financial [...]
There was a technical problem due to the PDF format of the document. The links are as follows: http:/ [...]
25/09/2017