26
|
Can you confirm that tenders have to be received by your offices by 16.00 hrs on Friday 25 May - our [...]
|
As stated in the invitation to tender letter, the deadline for submission of tenders is 25/5/2012 (23 [...]
|
24/05/2012
|
|
25
|
Is there a form for a "statement confirming the validity of the tender?" What is meant by "preferably [...]
|
There is no standard form for the statement confirming the validity of the tender. You should state in [...]
|
22/05/2012
|
|
24
|
Is it meant to indicate the turnover of similar projects in the last three years?
|
Section 5 states that a statement of the tenderer’s general turnover for the last 3 years (yearly level [...]
|
22/05/2012
|
|
23
|
May signed documents be attached as a copy/scan? The Power of Attorney needs signatures from parties [...]
|
A copy/scan of the Power of Attorney document is acceptable at this stage of the tender submission. Originals [...]
|
22/05/2012
|
|
22
|
Concerning the various documents that need be delivered such as the Exclusion Criteria Form, may they [...]
|
At this stage of the tender procedure exclusion criteria documents can be signed with an electronic signature [...]
|
22/05/2012
|
|
21
|
Dear Madams/Sirs please let us know if for subcontractors scanned document (letter of intent, legal entity [...]
|
A copy/scan of the mentioned documents is acceptable at this stage of the tender submission. Originals [...]
|
22/05/2012
|
|
20
|
We understand the results of the project will be presented to a steering group and a conference as part [...]
|
Rights relating to intellectual property developed during the engineering phase of the demonstration [...]
|
16/05/2012
|
|
19
|
In section 1.2.4 of the tender it is stated that the costs for materials and equipment needed to assemble [...]
|
Materials and equipment are to be funded by the contractor (or whichever other party is prepared to provide [...]
|
16/05/2012
|
|
18
|
It is stated as part of the Deliverables section of the tender that it is expected that the engineering [...]
|
Tenderers may propose an alternative timetable, if what they propose covers all the elements of the project [...]
|
16/05/2012
|
|
17
|
Considering that the contractor builds a demonstration plant using a component which he bought from a [...]
|
The Commission acquires everything that is produced during the contract, but no pre-existing rights ( [...]
|
16/05/2012
|
|