1
|
1. The “Estimates for Work area 2 - ICT BackOffice” in tender specifications section 2.2.5.5 are summing [...]
|
1. The estimations in the work area Backoffice under 2.2.5.5. indeed add up to 101% due a rounding error [...]
|
22/01/2018
|
|
2
|
The technical annex 4 refer in the first page: […]In chapter 9 the mandatory Key performance indicators [...]
|
Indeed the reference should be to chapter 8 instead of chapter 9.
|
22/01/2018
|
|
3
|
Doc “Tender Specifications”, pg 28: Profiles required: “Server Administrator” but in “Technical Annex [...]
|
The profile name “Server administrator” and “System administrator” should be read as equivalent. In the [...]
|
22/01/2018
|
|
4
|
Will you provide a template for the proof of references to projects ?
|
ECDC will not provide a template. The contractor may choose himself a simple template.
|
22/01/2018
|
|
5
|
Do you confirm that the estimation of the annual workload in man-hours (for instance 90 for the frontoffice [...]
|
It is correct, the right column gives an indication of work hours outside office hours and outside the [...]
|
22/01/2018
|
|
6
|
The Technical Proposal must contain a proposal for a Service Level Agreement (SLA) based on Annex 4 ( [...]
|
A) Indeed there is a relationship in the desired service agreement and the technical offer, while there [...]
|
22/01/2018
|
|
7
|
Online the time limit says last day to hand in our offer is 16/02/2018 and in the material provided to [...]
|
The official deadline for submission of tenders is 28/02/2018, this will be corrected as soon as possible [...]
|
22/01/2018
|
|
8
|
Can you please give detailed information about the applications to host within this FwC, regarding data [...]
|
You find information about the hosting service provided by the Backoffice team under 2.2.4.2 in the tender [...]
|
25/01/2018
|
|
9
|
The TS, page 13 Minimum Requirements, stipulates: "1. All contractor’s consultants working for ECDC need [...]
|
All contractors consultants working for ECDC need to have an ITIL foundation certification. This is applicable [...]
|
26/01/2018
|
|
10
|
In the case of 18 penalty points (and higher) no other consequence than "Possible termination of FWC" [...]
|
It is correct, in the situation of 18 or more penalty points and that ECDC would not cancel the FWC, [...]
|
26/01/2018
|
|
11
|
Technical and Professional Capacity. See TS, §3.2.3, p.46. Question 1. How many 'sample CVs' need to [...]
|
Regarding the CV, at least the CVs of the initial proposed team of 4.1. page 47 should be presented. [...]
|
26/01/2018
|
|
12
|
With reference to Section “2.1 Introduction: Background to the invitation to tender “, of the procurement [...]
|
In case you need to cooperate with other contractors to solve an issue, e.g. you have to submit an incident [...]
|
01/02/2018
|
|
13
|
With reference to section “2.2.7.5 Service level definitions” of the “EN-Tender Specifications_9196_IT_Infrastructure [...]
|
ECDC has 5 systems with BIA level 4. There is no system at BIA level 5, as this level would mean no system [...]
|
01/02/2018
|
|
14
|
With reference to “2.2.7.3 Standby service” of the “EN-Tender Specifications_9196_IT_Infrastructure services [...]
|
As described under 2.2.7.3. in rare cases standby duty intervention is required (during 2016 in 20 cases [...]
|
01/02/2018
|
|
15
|
With reference to section “3.Interfaces, roles and responsibilities” of “EN-Technical Annex 4 Draft SLA [...]
|
1. You are free in the composition of your proposed team, but commonly one would expect that existing [...]
|
01/02/2018
|
|
16
|
With reference to section “2.2.4.2. ICT BackOffice” of the Tender Specifications, the area of management [...]
|
Incidents with Microsoft could be followed by either team, depending on the nature of the request, e.g [...]
|
01/02/2018
|
|
17
|
With reference to section “4.1. Technical Proposal” of the Tender Specifications, for each required document [...]
|
CVs can be annexed and are excluded from the page limits. Cover page, table on content etc are included [...]
|
01/02/2018
|
|
18
|
With reference to section “2.2.6.1 Off-site infrastructure requirements” of the “EN-Tender Specifications [...]
|
ECDC will provide the consultants with laptops and software that will allow them to work on the ECDC [...]
|
01/02/2018
|
|
19
|
With reference to section “3.2.3. Technical and Professional Capacity” of the Tender Specifications, [...]
|
Indeed 2.2.6 gives details on the minimum security requirements that should be described under 3.2.3
|
01/02/2018
|
|
20
|
With reference to Section “3. IT Service Manager” of the Technical Annex 3 – Consultancy Profiles, in [...]
|
Your understanding is correct. The ITIL expert certification is sufficient.
|
01/02/2018
|
|
21
|
With reference to section “8.List of Key Performance Indicators” of “EN-Technical Annex 4 Draft SLA” [...]
|
You are right that the reference is wrong, as the list of contract managers is now in the document “EN-Technical [...]
|
01/02/2018
|
|
22
|
With reference to Technical Annex 3 – Consultancy Profiles, there are descriptions for the profiles of [...]
|
Indeed your understanding is correct and Front Office System Administrator is equal to FrontOffice administrator [...]
|
01/02/2018
|
|
23
|
With reference to “2.2.7.3 Standby service” of the “EN-Tender Specifications_9196_IT_Infrastructure services [...]
|
The standby duty service is always performed in full calendar weeks. As mentioned under 2.2.7.1 ECDC [...]
|
01/02/2018
|
|
24
|
With reference to Section “3.2.1. Legal Capacity” of the Tender Specifications, the Tenderer shall provide [...]
|
All the members of the Consortium should provide Legal Entity form, as they will be jointly liable for [...]
|
05/02/2018
|
|
25
|
With reference to Section “1.5. Subcontracting”, it is our understanding that in case that subcontracting [...]
|
If the tenderer relies on the subcontractors to fulfil the selection criteria, these subcontractors must [...]
|
05/02/2018
|
|