11
|
In relation to the water-supply system, with reference to point I.3.1 of the tender specifications, does[...]
|
In case the installation of a water-supply system is required for the operation of the proposed equipment[...]
|
21/02/2018
|
|
10
|
With reference to annexes IV (financial tender form) and V (list of products) to the tender specifications[...]
|
In the financial tender form (annex IV to the tender specifications), it is only required to indicate[...]
|
21/02/2018
|
|
9
|
With reference to point I.6.1 of the tender specifications, what do you mean by "corrective maintenance[...]
|
The framework contract will cover an all-inclusive maintenance (corrective and preventive) of the equipment[...]
|
15/02/2018
|
|
8
|
Could you inform us if the laboratory has a contact person?
|
Please note that all necessary information for the performance of the contract, including the details[...]
|
15/02/2018
|
|
7
|
Could you provide us with information on the method of invoicing?
|
Please consult the tender documents, as published on the eTendering platform, containing all the necessary[...]
|
15/02/2018
|
|
6
|
In order to present a new equipment model, is it possible to meet and have the contact details of the[...]
|
Please note that contact between the contracting authority and candidates or tenderers is prohibited [...]
|
15/02/2018
|
|
5
|
With reference to point I.3.1 of the tender specifications, the equipment should "include the installation[...]
|
The technical specifications of the tender specifications require the installation of a water-supply [...]
|
08/02/2018
|
|
4
|
With reference to point I.3.9 of the tender specifications, and the requirement that the proposed products[...]
|
For traceability reasons, the technical specifications of the tender specifications require at least [...]
|
08/02/2018
|
|
3
|
With reference to point I.6.1 of the tender specifications, the corrective maintenance consists of "a[...]
|
Please note that "freephone number" or "hotline" service should be understood as a telephone line dedicated[...]
|
08/02/2018
|
|
2
|
With reference to point I.3.2 of the tender specifications, the contract includes all works and services[...]
|
The laboratory management software currently used was created specifically for the Commission's needs[...]
|
08/02/2018
|
|