1
|
Dear Sir/Madam, With regard tot he terminals that will need to go onto the 2 different types of RPAS. [...]
|
1. The details of the first type of RPAS are: TAKE-OFF WEIGHT / MASS UP TO 150 KG (MAXIMUM) ENDURANCE [...]
|
11/04/2018
|
|
2
|
Dear Sir/Madam, Can we request an area of operation that the RPAS will require to have BLOS communications [...]
|
The areas of operation can be all sea areas surrounding the European Union with an EU or EFTA country [...]
|
11/04/2018
|
|
3
|
With reference to Paragraphs 2.2.2 & 2.2.3 & 8.1.2 in the Tender Specification document (EN-02 [...]
|
The Contracting Authority may award several FWCs per lot. The mechanism for implementing the FWC per [...]
|
20/04/2018
|
|
4
|
With reference to the second bullet point in paragraph 8.1.2 in the Tender Specification document (EN [...]
|
During the implementation of the FWC, the Contractors may add new terminals in order to ensure SATCOM [...]
|
20/04/2018
|
|
5
|
Can the same company be subcontractor in more than one tender to the FWC?
|
Please refer to point 10 of the Tender Specifications - economic operators on the market are free to [...]
|
20/04/2018
|
|
6
|
To provide an offer in Mbps, it is required to establish a link budget. Can you provide details about [...]
|
The details of the terminals currently used by the Agency can not be provided. The terminal requirements [...]
|
20/04/2018
|
|
7
|
Can you confirm: - The method used to evaluate the link availability (exclusions, periods of time to [...]
|
-The Bidders can select the method that they consider more suitable to evaluate the link availability [...]
|
20/04/2018
|
|
8
|
Are there alreary routers, and of which type, aboard the current fleet of RPAS ? Will it be the responsibility [...]
|
The Agency operates with different RPAS platforms, most of them already have routers on-board to distribute [...]
|
20/04/2018
|
|
9
|
As some French overseas territories are included in the EU territory according to international treaties [...]
|
As per Tender Specifications: 1.1.8 and Appendix 1: 2.1: Areas of operation can be all sea areas surrounding [...]
|
20/04/2018
|
|
10
|
a) Will EMSA please verify the SATCOM equipment the vendors propose for Lot 1, (2 Mbps data rate) is [...]
|
a) In principle both lots are intended for fixed wing RPAS. The Agency's current platforms are medium [...]
|
20/04/2018
|
|
11
|
Concerning point 15.4: what are the criteria adopted for assessing the financial capacity? What is the [...]
|
The basic method is the analysis of the tenderer’s annual accounts (or financial statements). The financial [...]
|
23/04/2018
|
|
12
|
Concerning Appendix 1 point 2.4.: How many SATCOM terminals have to be provided for each size (medium [...]
|
There is no minimum nor maximum number of terminals that must be offered per category. Offers will be [...]
|
23/04/2018
|
|
13
|
With reference to EN-03 Tender Specifications Appendix 1 Technical Specifications.pdf section 2.1.1, [...]
|
The latency requirement of 2s shall be maintained at least between the RPAS and the LGCS. The Agency [...]
|
23/04/2018
|
|
14
|
With reference to EN-03 Tender Specifications Appendix 1 Technical Specifications.pdf section 2.1.1, [...]
|
It is the Bidders choice to use the same SATCOM terminal for the primary and the secondary Command and [...]
|
23/04/2018
|
|
15
|
Is it possible to make an inspection on site for a better understanding of installation, configuration [...]
|
An on-site inspection is not available during the tender process. Note that the sites themselves are [...]
|
23/04/2018
|
|
16
|
With reference to EN-03 Tender Specifications Appendix 1 Technical Specifications.pdf section 2.1.1, [...]
|
Yes, the Command and Control link data rate applies to both the return and forward link. The data rate [...]
|
23/04/2018
|
|
17
|
With reference to EN-03 Tender Specifications Appendix 1 Technical Specifications.pdf section 2.5.1, [...]
|
The required throughput is symmetric 10Mbps as defined in point 2.5 of Appendix 1 Technical Specifications [...]
|
23/04/2018
|
|
18
|
Dear sir/madam, due to the complexity of this project, we kindly request the extension of the deadline [...]
|
EMSA understands the complexity of the tender and for that reason already foresaw a bid submission period [...]
|
23/04/2018
|
|
19
|
1. Do you already have aircrafts or UAVs in operation or should they will be offered here as well? 2. [...]
|
1. EMSA already has RPAS in operation as well as a new procurement for large size RPAS (EMSA/OP/1/2018 [...]
|
23/04/2018
|
|
20
|
§1.1.1: How many RPAS are or will be deployed at the same time at most? Could you please give us an estimation [...]
|
The RPAS services are offered by EMSA free of charge to EU Member States, Candidate Countries and EFTA [...]
|
30/04/2018
|
|
21
|
§1.1.2: Could you please indicate the customer POP where all the traffic should be delivered?
|
The POP where all the traffic should be delivered will be the Local Ground Control Station (LGCS) that [...]
|
30/04/2018
|
|
22
|
§1.2.4: Could you please provide the delivery point for the VSAT equipment? To EMSA premise? Or at the [...]
|
The delivery point for the VSAT equipment will be the place of the RPAS mission location as indicated [...]
|
30/04/2018
|
|
23
|
§2.4: Will the customer have a router integrated in each RPAS? If yes, could you please specify the brand [...]
|
EMSA operates with different RPAS platforms,those meant to be operated beyond Radio line of Sight already [...]
|
30/04/2018
|
|
24
|
§6.1.2: Where will take place the integration of SATCOM antenna on the RPAS?
|
The installation of the SATCOM terminal on the RPAS is an activity that shall be covered by the terminal [...]
|
30/04/2018
|
|
25
|
§1.1.8: Could you please confirm that the teleports must be located in an EU country for security reason [...]
|
In the Tender Specifications there are no requirements on the location, the level of accreditation and [...]
|
30/04/2018
|
|