13
|
Does all subcontractors need to sign the "declaration of honour"; or is this document to be filled out [...]
|
Please refer to section 3.2 Non-exclusion and Selection of the document Tender specifications_Part 1_ [...]
|
21/01/2019
|
|
12
|
The ITT does mention the specific differences in observation reporting practice between EUR and CHN. [...]
|
We confirm that the user needs to modify the XML file to change the temporal intervals for the daily [...]
|
16/01/2019
|
|
11
|
Section 2.4 - Can you describe more precisely the timing of the set-up phase : when will it starts (at [...]
|
Models and tools can be made available on the day of contract signature; equally, the kick-off meeting [...]
|
15/01/2019
|
|
10
|
Considering the fact that most meteorological observations relating to precipitation are based on 6, [...]
|
For the JRC the priority lies within the 24h daily precipitation accumulates and then if available sub-daily [...]
|
15/01/2019
|
|
9
|
(i) The variable TGP20 (Table 9) is mentioned in the Techincal Annex but it is not included in the available [...]
|
A corrigendum of the Technical Annex (v. 11/01/2019) has been published. The typo and the wrong parameters [...]
|
11/01/2019
|
|
8
|
Considering point 1.3.2 of Tender Specifications Part. 1 Administrative Annex, does the subcontractor [...]
|
The selection criteria apply to the tenderer as a whole, therefore the assessment is based on the combined [...]
|
11/01/2019
|
|
7
|
In section 2.5 "Award criteria - Technical Quality" of the administrative annex, the sub-criterion "Technical [...]
|
Tender documents do not postulate a certain, unique HW setup, but ask the tenderer to provide a suitable [...]
|
08/01/2019
|
|
6
|
The technical annex states that the station list (EUR and CHN) is provided by the JRC, but there is only [...]
|
Please see document: 2.2 Tender specifications_Part 2_Technical_Annex v. 07 01 2019. The sentence has [...]
|
07/01/2019
|
|
5
|
Concerning the observed station data necessary for the implementation of the Service 1.1, the technical [...]
|
It is the task of the tenderer to provide evidence that they have access to the required number of stations [...]
|
07/01/2019
|
|
4
|
The technical specification reads: “90% of the stations per country shall be provided by the Contractor [...]
|
The tenderer shall provide evidence in the tender that he has access to meteorological observations of [...]
|
07/01/2019
|
|