14
If both lots are awarded to one consortium it is possible to have synergies between the studies. How [...]
Tenderers may submit a tender for lot 1, for lot 2, or for both lots. Offers will be evaluated per Lot [...]
17/04/2019
13
Is it possible that both lots are awarded to one tenderer?
Yes. Each contract will be awarded based on the most economically advantageous tender, according to the [...]
17/04/2019
12
Is it correct to assume that we submit one administrative offer (parts A,B,C), two technical offers; [...]
Yes, this is correct in the case that the same tenderer submits a tender for both Lots.
17/04/2019
11
The call for tenders on “Blue economy development framework” consists of two lots that are tendered simultaneously [...]
As explained in section 1.2, the European Commission’s Directorate-General for Maritime Affairs and Fisheries [...]
17/04/2019
10
Given the European nature of EASME, would EASME have a preference on the focus on either world financial [...]
As stated in section 1.5.2, the scope of the study is global and must cover the Atlantic, Pacific, Indian [...]
17/04/2019
9
Given the European nature of EASME and the global scope of the study, would the EASME have a preference [...]
As stated in section 1.5.2, the scope of the study is global. In terms of activities and sectors, the [...]
17/04/2019
8
One of the study tasks is to define unsustainable finance in the blue economy, section 1.5.1, task 2. [...]
Draft answer: Section 1.3 refers to subsidies that are currently exacerbating overfishing and illegal [...]
17/04/2019
7
“Financial flows” as mentioned in section 1.4.1. is a broad term that could include all financial flows [...]
As stated in section 1.4.2, the study (Lot 1) will examine the funding and investment sources of those [...]
17/04/2019
6
Similar to the green economy; should the concept and definition of blue economy in itself mean it is [...]
Draft answer: The 2018 annual economic report on the EU blue economy of the European Commission's Directorate-General [...]
17/04/2019
5
Sustainability is a broad term that has several definitions. Section 1.2 suggests to focus on the sustainable [...]
Sustainable development is described in section 1.2 of the call for tender as follows: "Sustainable development [...]
17/04/2019
4
The background of this study is the interest in developing a sustainable blue economy. Should this study [...]
As stated in section 1.2, the context for the studies includes the landmark international agreements [...]
17/04/2019
3
Does EASME have a preference to look at established blue economic sectors or emerging blue economic sectors [...]
For Lot 1, section 1.3 lists as examples unsustainable practices in a number of blue economy sectors. [...]
17/04/2019
2
The geographical scope described in section 1.5.2. mentions “international” and “ocean”. Does the scope [...]
As stated in section 1.5.2, the scope of the study is international and it must cover blue economy activities [...]
17/04/2019
1
Is it possible to submit a tender only for lot 1?
Tenderers may submit a tender for lot 1, for lot 2 or for both lots.
16/04/2019