Ajánlati felhívás részletei

Cím:
Technikai és operatív szolgáltatások a CISE-projekthez
Ajánlatkérő:
European Maritime Safety Agency
A TED-es közzététel dátuma:
27/08/2019
Az ajánlatok kézhezvételére vonatkozó határidő:
03/10/2019
Státusz:
Lezárt
Szűrési paraméterek mutatása

Results per page: 10 | 25 | 50 17 Kérdések found, displaying all Kérdések .
# Kérdés Válasz Legutóbbi közzététel dátuma Státusz
17
EN-Annex B.02 Tender Specifications, p. 8-10, Section 2.3.2.2 Node configuration Question: In order to [...]
EUCISE2020 has developed a pre-operational network connecting ten national nodes, and eighteen national [...]
27/09/2019
16
EN-Annex B.02 Tender Specifications “REQ_18 The same person cannot be allocated to two different levels [...]
The level 0 is the web site. As stated in the "Technical and Operational support" document (see appendices [...]
27/09/2019
15
EN-Annex B.02 Tender Specifications, p. 8-10, Section 2.3.2.1 Incident and Problem management Question [...]
EUCISE2020 has developed a pre-operational network connecting ten national nodes, and eighteen national [...]
27/09/2019
14
In EN-Annex B.02 Tender Specifications, Section 15.5.1, p. 24/27, we read: “Tenderers shall have at least [...]
The “list of tasks” performed under the contracts submitted as evidence in 15.5.2 and provided under [...]
27/09/2019
13
EN-Annex B.02 Tender Specifications “REQ_14. Considering all the Module 1 support processes, the tenderers [...]
It is confirmed that for module 1 you may propose an adequate team composition, and that you are not [...]
27/09/2019
12
EN-Annex B.02 Tender Specifications “REQ_35. In order to estimate the effort and competences required [...]
EUCISE2020 has developed a pre-operational network connecting ten national nodes, and eighteen national [...]
27/09/2019
11
EN-Annex B.02 Tender Specifications “REQ_21. Table 2 - Incident Classification and Reaction Times.” and [...]
1. In case of a problem (2nd level), the SLA to apply or the resolution (time to solve) will be agreed [...]
27/09/2019
10
In EN-Annex B.02 Tender Specifications, Section 15.5.2, p. 24/27, we read: “For the standard/prerequisite [...]
1. EMSA confirms that the lesson(s) learnt requested as evidence for each contract is not counted in [...]
27/09/2019
9
EN-Annex B.02 Tender Specifications “REQ_42. The Project Management Officer can request the contractor [...]
As part of module 1, EMSA can request to the contractor up to 4 CISE nodes installation for the entire [...]
27/09/2019
8
EN-Annex B.02 Tender Specifications “REQ_27. The Incident Handling Procedures (IHP) are used to address [...]
1. It refers to the tool from implementing the IHP procedure which is wiki-based. 2. The contractor is [...]
27/09/2019
7
With reference to Art. II.18. INVOICES, VALUE ADDED TAX AND E-INVOICING of Framework Contract, in case [...]
In case of Joint Tender, the leading contractor will be responsible for the administrative management [...]
23/09/2019
6
With reference to Art. II.18. INVOICES, VALUE ADDED TAX AND E-INVOICING of Framework Contract, in case [...]
Pursuant to Articles I.7 and II.18 of the draft FWC (IT), in case of joint tender, invoices must contain [...]
23/09/2019
5
Can you please confirm that we can sign all the required statements/tender forms as well as the Tender [...]
Qualified electronic signature will be accepted as digital equivalent to handwritten signature.
23/09/2019
4
In case of Joint Offer, do all the members of the consortium have to provide the Financial statements [...]
In case of Joint offer, the economic and financial capacity is assessed for all economic operators jointly [...]
19/09/2019
3
The CISE technical documentation to be developped is not clear for us. What is the existing documentation [...]
The status of the documents to be maintained and updated are included as appendices to the Tender Specifications [...]
19/09/2019
2
Are there existing Service Level Agreements that have been developped by the consortium and that must [...]
There are no Service Level Agreements (SLA) defined within the context of the EUCISE2020 project that [...]
19/09/2019
1
In case of Joint Offer, we shall present the Financial Identification Form of the Leader/Co-ordinator [...]
You may submit only one Financial Identification Form from the Leader/Coordinator related to the bank [...]
10/09/2019