23
|
2. Duration of the Contract The Terms of Reference (TOR) para 5.2 indicates the max. duration of the [...]
|
According to the ToRs the maximum duration of the TA contract is "72 months but not later than 28 December [...]
|
01/10/2019
|
|
22
|
TA TOR Section 5.2. States max duration of the works is 4 years (48 months) including Defects Liability [...]
|
According to the ToRs the maximum duration of the TA contract is "72 months but not later than 28 December [...]
|
01/10/2019
|
|
21
|
Question 4 Terms of Reference, Section 6.1.2 Non Key Experts For the purpose of fair competition, please [...]
|
It's up to the tenderers to decide the split.
|
01/10/2019
|
|
20
|
In the SCC reference is made to Annex VI, Article 31 of the Cotonou Agreement signed, by all ACP [...]
|
Cotonou Agreement is a treaty between the European Union and the ACP countries. Malawi is one of the [...]
|
01/10/2019
|
|
19
|
Please confirm if Junior Expert required under ToR, 6.1.3. Support Staff and backstopping is required [...]
|
According to the provisions of the Terms of Reference (ToR), the Junior Expert should be assigned during [...]
|
01/10/2019
|
|
18
|
ToR Activity 2 and Section 4.1.1.2. Have all the current Detailed Designs been reviewed since original [...]
|
No, detailed designs were prepared in 2017 and 2018.
|
01/10/2019
|
|
17
|
ToR Activity 2 and Section 4.1.1.2. As part of the detailed design stage were works tender documents [...]
|
The works tender documents were produced by the design consultant and according to the Activity 2 (3rd [...]
|
01/10/2019
|
|
16
|
6. Advance Payment The Terms of Reference (TOR) is silent about advance payment.
|
The advance payment is equivalent with the pre-financing which, according to the provisions of the draft [...]
|
01/10/2019
|
|
15
|
5. Reports The Terms of Reference (TOR) is silent about number of copies of reports. Query: - Number [...]
|
According to the ToRs, point 7.2., the agreed version of the reports should be submitted in e-copy to [...]
|
01/10/2019
|
|
14
|
4. Copies Instructions to Tenders is silent about number of copies of both Technical Offer and Financial [...]
|
According to the Instructions to tenderers, point 6, the Technical offer and Financial offer must be [...]
|
01/10/2019
|
|
13
|
3. CV Pages Instructions to Tenders page 5 of 12 states “each CV should be no longer than 3 pages and [...]
|
Section A Instructions to Tenderers 6.1 (3) b) should be read as following: "CV should be no longer than [...]
|
01/10/2019
|
|
12
|
1. Part C of tender dossier Instruction to tenders indicates Part C of the tender dossier. Query: - We [...]
|
Part C is equivalent with point/section C - Declarations and other Templates. The content of the tender [...]
|
01/10/2019
|
|
11
|
Question on taxes The TOR Clause 4.3.3. “Support to be provided by the Contracting Authority and/or other [...]
|
According to the provisions of the Terms of Reference regarding taxes, is the Consultant responsibility [...]
|
01/10/2019
|
|
10
|
Question 3 Instructions to Tenderers, Section 6.1 Technical offer, (3) Key Experts, Tenderers must provide [...]
|
The ‘employer certificates or references’ for key experts’ proof of experience is required for the professional [...]
|
01/10/2019
|
|
9
|
Question 1 Instruction to Tenderers, point 2. Timetable and Section 14.2.1 Interviews, suggests potential [...]
|
The invited experts to the interviews will have the option to participate in person at EIB Headquarters [...]
|
01/10/2019
|
|
8
|
Instructions to Tenders, Section 2. Timetable. We understand the urgency to move forward with this project [...]
|
The extension is granted. Thus, the deadline for receipt of tenders is 21 October 2019 at 23:59h. A corrigendum [...]
|
01/10/2019
|
|
7
|
Ref. Article 34 Please confirm that the Consultant’s liability under Article 34 of the contract are also [...]
|
This cannot be confirmed. Article 34 refers to contract liability whereas Article 12 covers indemnification [...]
|
01/10/2019
|
|
6
|
Ref. Article 19 Please confirm that the liquidated damages required under the contract’s Article 19 shall [...]
|
There is no ceiling for such liquidated damages, as the Contracting Authority has the right to terminate [...]
|
01/10/2019
|
|
5
|
Ref. Article 12.5 Will you accept that the Consultant’s overall liability under the contract is limited [...]
|
No.
|
01/10/2019
|
|
4
|
Ref. Article 12.2 Will you accept that the Consultant’s liability with respect to any third party claims [...]
|
The limitation of liability for the benefit of the Consultant may not be applied for extra-contractual [...]
|
01/10/2019
|
|
3
|
Ref. Article 12.1 Please confirm that the indemnity given to the Contracting Authority in Article 12.1 [...]
|
This cannot be confirmed. The Article 12.2 covers only the indemnity for “actions, claims, losses or [...]
|
01/10/2019
|
|
2
|
Ref. Article 7.1 Please confirm that the indemnity given to the Contracting Authority in Article 7.1 [...]
|
This cannot be confirmed. The indemnity referred to in Article 7.1 covers “any claims and proceedings [...]
|
01/10/2019
|
|
1
|
Section A Instructions to Tenderers 6.1 (3) b): ‘CV should be no longer than 3 pages.’ then ‘In case [...]
|
Section A Instructions to Tenderers 6.1 (3) b) should be read as following: "CV should be no longer than [...]
|
01/10/2019
|
|