The deadline for receipt of tenders is extended by two weeks. The new deadline is 21/10/2019 at 23:59h (CET).
Naslov:
Tehnična pomoč v podporo izvajanju projekta sanacije ceste M1 v Malaviju
Naročnik:
European Investment Bank (EIB)
Datum objave v TED:
27/08/2019
Rok za prejem ponudb:
21/10/2019
Status:
Zaprto
Prikaži parametre filtra

Results per page: 10 | 25 | 50 23 Vprašanja found, displaying all Vprašanja .
# Vprašanje Odgovor Zadnja objava Status
23
2. Duration of the Contract The Terms of Reference (TOR) para 5.2 indicates the max. duration of the [...]
According to the ToRs the maximum duration of the TA contract is "72 months but not later than 28 December [...]
01/10/2019
22
TA TOR Section 5.2. States max duration of the works is 4 years (48 months) including Defects Liability [...]
According to the ToRs the maximum duration of the TA contract is "72 months but not later than 28 December [...]
01/10/2019
21
Question 4 Terms of Reference, Section 6.1.2 Non Key Experts For the purpose of fair competition, please [...]
It's up to the tenderers to decide the split.
01/10/2019
20
In the SCC reference is made to Annex VI,  Article 31 of the Cotonou Agreement signed, by all ACP [...]
Cotonou Agreement is a treaty between the European Union and the ACP countries. Malawi is one of the [...]
01/10/2019
19
Please confirm if Junior Expert required under ToR, 6.1.3. Support Staff and backstopping is required [...]
According to the provisions of the Terms of Reference (ToR), the Junior Expert should be assigned during [...]
01/10/2019
18
ToR Activity 2 and Section 4.1.1.2. Have all the current Detailed Designs been reviewed since original [...]
No, detailed designs were prepared in 2017 and 2018.
01/10/2019
17
ToR Activity 2 and Section 4.1.1.2. As part of the detailed design stage were works tender documents [...]
The works tender documents were produced by the design consultant and according to the Activity 2 (3rd [...]
01/10/2019
16
6. Advance Payment The Terms of Reference (TOR) is silent about advance payment.
The advance payment is equivalent with the pre-financing which, according to the provisions of the draft [...]
01/10/2019
15
5. Reports The Terms of Reference (TOR) is silent about number of copies of reports. Query: - Number [...]
According to the ToRs, point 7.2., the agreed version of the reports should be submitted in e-copy to [...]
01/10/2019
14
4. Copies Instructions to Tenders is silent about number of copies of both Technical Offer and Financial [...]
According to the Instructions to tenderers, point 6, the Technical offer and Financial offer must be [...]
01/10/2019
13
3. CV Pages Instructions to Tenders page 5 of 12 states “each CV should be no longer than 3 pages and [...]
Section A Instructions to Tenderers 6.1 (3) b) should be read as following: "CV should be no longer than [...]
01/10/2019
12
1. Part C of tender dossier Instruction to tenders indicates Part C of the tender dossier. Query: - We [...]
Part C is equivalent with point/section C - Declarations and other Templates. The content of the tender [...]
01/10/2019
11
Question on taxes The TOR Clause 4.3.3. “Support to be provided by the Contracting Authority and/or other [...]
According to the provisions of the Terms of Reference regarding taxes, is the Consultant responsibility [...]
01/10/2019
10
Question 3 Instructions to Tenderers, Section 6.1 Technical offer, (3) Key Experts, Tenderers must provide [...]
The ‘employer certificates or references’ for key experts’ proof of experience is required for the professional [...]
01/10/2019
9
Question 1 Instruction to Tenderers, point 2. Timetable and Section 14.2.1 Interviews, suggests potential [...]
The invited experts to the interviews will have the option to participate in person at EIB Headquarters [...]
01/10/2019
8
Instructions to Tenders, Section 2. Timetable. We understand the urgency to move forward with this project [...]
The extension is granted. Thus, the deadline for receipt of tenders is 21 October 2019 at 23:59h. A corrigendum [...]
01/10/2019
7
Ref. Article 34 Please confirm that the Consultant’s liability under Article 34 of the contract are also [...]
This cannot be confirmed. Article 34 refers to contract liability whereas Article 12 covers indemnification [...]
01/10/2019
6
Ref. Article 19 Please confirm that the liquidated damages required under the contract’s Article 19 shall [...]
There is no ceiling for such liquidated damages, as the Contracting Authority has the right to terminate [...]
01/10/2019
5
Ref. Article 12.5 Will you accept that the Consultant’s overall liability under the contract is limited [...]
No.
01/10/2019
4
Ref. Article 12.2 Will you accept that the Consultant’s liability with respect to any third party claims [...]
The limitation of liability for the benefit of the Consultant may not be applied for extra-contractual [...]
01/10/2019
3
Ref. Article 12.1 Please confirm that the indemnity given to the Contracting Authority in Article 12.1 [...]
This cannot be confirmed. The Article 12.2 covers only the indemnity for “actions, claims, losses or [...]
01/10/2019
2
Ref. Article 7.1 Please confirm that the indemnity given to the Contracting Authority in Article 7.1 [...]
This cannot be confirmed. The indemnity referred to in Article 7.1 covers “any claims and proceedings [...]
01/10/2019
1
Section A Instructions to Tenderers 6.1 (3) b): ‘CV should be no longer than 3 pages.’ then ‘In case [...]
Section A Instructions to Tenderers 6.1 (3) b) should be read as following: "CV should be no longer than [...]
01/10/2019