130
"As per Technical Specification – Scope Description RE98005 - P.013273.2004, page 27, Note: ii. The following [...]
The preliminary design has recommended to keep into operation the transformers feeding the existing QGBT [...]
09/07/2020
Answered
129
Please clarify the new location of the existing electrical chiller
Please refer to document P_013273_2004_LY94001, where a relocation of the existing electrical chillers [...]
09/07/2020
Answered
128
With reference to the "Summary" sheet of the file "IT-03it-Financial + offer + form_001.xlsx" We point [...]
the revised file has been published
09/07/2020
Answered
127
With regard to the technical qualification criteria T2 and T3 it is asked to specify whether the roles [...]
Any member of the Design team described in requirement T2 can hold any position defined in criterion [...]
08/07/2020
Answered
126
Good morning, with reference to "Tender Specifications, Part I: administrative specifications- > in [...]
The participating company (tenderer), being member or leader of an existing holding, can take advantage [...]
08/07/2020
Answered
125
We ask to clarify if the cost of chemicals necessary during phase 4 is charged to the owner or to the [...]
In the document "50 –Minimum requirements for O&M" – Chap. 12 it is clarified that " The supplies [...]
08/07/2020
Answered
124
We ask to clarify if the cost of spare parts supplied during phase 4 is in charge to the owner or to [...]
In the document "50 –Minimum requirements for O&M" – Chap. 4 it is clarified that "The economic costs [...]
08/07/2020
Answered
123
We kindly ask to confirm or clarify if excavation activities and the installation of the prefabricated [...]
The document P.013273.2004 RE98005_02 Technical Specification - Scope Description, § 4.2.3 states: " [...]
08/07/2020
Answered
122
With reference to "50-Minimum requirements for O&M " chapter 1 it can be read: " In addition to these [...]
Water, hydrochloric acid and caustic soda depends basically on unforeseeable events, linked to occurrents [...]
08/07/2020
Answered
121
With reference to the data to be declared within the "Technical offer form" referred to the electrical [...]
The electrical efficiency value to be declared shall be the guaranteed one that will be verified during [...]
08/07/2020
Answered