Renseignements sur l'appel d'offres

Intitulé:
Services d'hébergement d'un centre de données destiné à assurer la continuité de...
Pouvoir adjudicateur:
European Maritime Safety Agency
Date de publication sur TED:
06/04/2020
Date limite pour la réception des offres:
11/05/2020
Statut:
Fermé
Afficher les paramètres de filtrage

Results per page: 10 | 25 | 50 47 Questions found, displaying 1 to 25.[First/Prev] 1, 2 [Next/Last]
# Question Réponse Date de dernière publication Statut
47
33. Do EMSA BCF has access conditions to take the racks completed or need to be in parts (ex: weight [...]
The current EMSA BCF hosting site has the access conditions to move the complete racks.
05/05/2020
46
32. The move includes cables?
Yes all cables should be moved and re-installed to be re-used in the new hosting center.
05/05/2020
45
31. The move of the systems/equipment is just in one wave or EMSA need more than one wave to do the move [...]
The move shall be performed in as less time as possible in order to minimise the risk for EMSA of being [...]
05/05/2020
44
30. In any circumstances the move includes moving all the systems/equipment but not the rack?
Racks shall be moved together with the other equipment, and shall be re-installed to be re-used in the [...]
05/05/2020
43
29. The system/equipment in the origin site has all the cables (energy, networking, etc.) tagged or is [...]
It is part of the service to tag it.
05/05/2020
42
28. Is it possible to refer the validity of the contract of this systems/equipment and the entity that [...]
After the award of the contract, a kick off meeting will be held to review the plan for the move, and [...]
05/05/2020
41
27. It’s possible to have Serial Number of each system/equipment in scope?
After the award of the contract, a kick off meeting will be held to review the plan for the move, and [...]
05/05/2020
40
26. What is the scope of EMSA team in this process?
EMSA Team will assist at the beginning with the shutdown phase (remotely), and then it will assist again [...]
05/05/2020
39
25. It is possible to have remote access to the systems/equipment located in EMSA BCF through EMSA DC [...]
Yes – after the contract award.
05/05/2020
38
24. We assume that EMSA will guaranty data recovery mechanisms (backups) and have operational recovery [...]
Yes
05/05/2020
37
23. We assume that no contingency plan or equipment will be needed besides the insurance policy for the [...]
The plan for the move will be assessed based on how it handles possible risks for EMSA during the transportation [...]
05/05/2020
36
22. After the moving and physically install system/equipment in the new EMSA BCF they will be power on [...]
Yes data re-syncronisation, functional and application tests will be executed by EMSA Team.
05/05/2020
35
21. All IP addressing will be the same in the EMSA BCF data center? There’s no need for system/equipment [...]
Yes – addressing will stay the same, hence no need for reconfiguration.
05/05/2020
34
20. No new equipment will be added in new EMSA BCF data center?
No new equipment will be added previously and during the move.
05/05/2020
33
19. Each system/ equipment will maintain its original rack position?
Yes
05/05/2020
32
18. Should we presume that the move will occur in single phase?
Yes
05/05/2020
31
17. All system/ equipment in EMSA BCF datacentre are independent and maybe shutdown?
Yes
05/05/2020
30
Thus, under the terms and for the purposes of the provisions of article 21º of the DIRECTIVE 2014/24/ [...]
Please refer to answer provided to part I.
05/05/2020
29
In this regard, the Law No. 26/2016 of August 22, expressly states that “A third party only has the right [...]
Please refer to answer provided to part I.
05/05/2020
28
Paragraph 1 of article 66 of the CCP refers that “for reasons of commercial, industrial, military or [...]
Please refer to answer provided to part I.
05/05/2020
27
The article 21º of the DIRECTIVE 2014/24/EU OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 26 February [...]
Please refer to answer provided to part I.
05/05/2020
26
MEO – SERVIÇOS DE COMUNICAÇÕES E MULTIMÉDIA, S.A., hereinafter also referred to as “MEO”, a public limited [...]
"As a general obligation stemming from the Treaty on the Functioning of the European Union and the Charter [...]
05/05/2020
25
The line to connect EMSA BCF and EMSA DC, could be a L3 line (IP or MPLS) or is required to be a L2 connection [...]
Line can be L3.
05/05/2020
24
On the Internet Connectivity - when filling the 5Gbps solution, the price should be the total amount [...]
Price shall be the total amount for the 5Gbps solution. Please note that all prices in the table are [...]
05/05/2020
23
Can all documents, that are to be uploaded by the tenderer, be digitally signed? including the ones where [...]
"According to Section 3 of Appendix I e-Submission Guidelines attached to the Tender Specifications, [...]
05/05/2020