19
Good evening, task 3 describes four sub-tasks (page 10) of which the 2nd and 4th task include a clear [...]
Task 3 covers the following sub-tasks: 3.1 Develop codes for calculation of indicators and/or statistical [...]
05/06/2020
18
In criterion T4 for an IT/Statistical assistant it is mentioned that at least four years of professional [...]
Work activity during further studies qualifies as professional activity as long as it was a remunerated [...]
05/06/2020
17
The current SSM webpage includes three distinct sections: Research notes, Research seminars and Research [...]
As indicated in the tender specifications the following tasks are subject of this call for tender: research [...]
31/05/2020
16
The tender specifications state that we can include additional profiles, separate to the Core team, which [...]
CVs of non-identified subcontractors, even when they are part of the additional team, is not required [...]
26/05/2020
15
In Clarification response number 12, you have specified that if a subcontractor doesn't meet the criteria [...]
As mentioned in Annex 1 of the tender specifications, the identified subcontractor is required to submit [...]
19/05/2020
14
Considering the unprecedented times created y Covid-19, we would like to ask if the Commission would [...]
Considering the current exceptional circumstances, the Commission temporarily accepts scanned and signed [...]
19/05/2020
13
Criterion T2 states that the tenderer must provide, among other information, 'total project amount and [...]
The scope of the project should be understood as the scope of the work (including topics covered, geographical [...]
14/05/2020
12
1. The tender specifications require the CVs of all members of the core team. Should CVs be provided [...]
The letter of intent is only to be filled in by the subcontractors, which means that every identified [...]
14/05/2020
11
Section 1.4.3.1 (page 8 of the ToR) states "The bid shall include a proposal for 12 Research Notes and [...]
A single proposal for a research note should not exceed 2 pages.
14/05/2020
10
Is the maximum budget of 2.4mio meant for the total duration of the contract (4 years) or per year?
The maximum budget of 2.4 million EUR is foreseen for the maximum duration of the contract (4 years).
06/05/2020