Results per page: 10 | 25 | 50 55 Questions found, displaying 1 to 25.[First/Prev] 1, 2, 3 [Next/Last]
# Question Answer Last publication date Status
55
Dear EMSA team, on section 2.1.1 Video Transmission Protocol (page 2/17), could you please clarify the [...]
This is a clerical error, this sentence is not relevant. The corrected 2nd paragraph of Section 2.1.1 [...]
17/09/2020
54
Dear EMSA team, on section 2.2 Real Time HTTPS API (page 6/17), could you please clarify the reference [...]
This is a clerical error, the text inside the brackets is not relevant. The corrected 2nd paragraph of [...]
17/09/2020
53
Dear EMSA, on section 2.1.1 from the document "EN-Appendix 4 TS - ICD for Service Providers_001.pdf", [...]
Yes, an RPAS can transmit data from two or more sensors simultaneously and the SurvSeaNet Web Application [...]
17/09/2020
52
Dear EMSA team, the complete Mission Analysis could be delivered as part of the contractor infrastructure [...]
See answer to Question #48 (https://etendering.ted.europa.eu/qa/question.html?questionId=70415)
14/09/2020
51
EN-Appendix+4+TS+-+ICD+for+Service+Providers_001.pdf, Paragraph 2.3, page 10 speaks of a chat XMPP server [...]
The use of an XMPP server is not mandatory. It is up to the Tenderer to propose the technical solutions [...]
14/09/2020
50
On Figure 5 in EN-Appendix+1+TS+-+Technical+Requirements.pdf, page 13, a couple of components mention [...]
This is a clerical error. The acronym "RPW" should be replaced with "SurvWebApp".
14/09/2020
49
EN-Appendix+4+TS+-+ICD+for+Service+Providers_001.pdf, Paragraph 2.4, page 11 speaks of an FTPS server [...]
The Document Repository does not need to support the FTPS protocol. It is up to the Tenderer to propose [...]
14/09/2020
48
The SurvWebApp System Architecture (EN-Appendix+1+TS+-+Technical+Requirements.pdf, Chapter 6, pages 6 [...]
The Tenderer may propose a hybrid model for the DMAP, however, EMSA shall be able to fully manage the [...]
14/09/2020
47
Following EMSA's clarification dated 25/08/2020 we would like to request the following clarification: [...]
Your understanding is correct, however, EMSA must be able to autonomously install, configure, and operate [...]
14/09/2020
46
Dear EMSA team, in continuity with question and answer number 4, which LMV instances should be connected [...]
As stated in the answer to Question #4, the two environments required are the Pre-Production and Production [...]
14/09/2020
45
Dear EMSA team, could you please detail the EMSA SonarQube Quality Gate? Especially the expected thresholds [...]
The EMSA Quality Gate referred to in "EN-Appendix 6 TS - Project Delivery_v3.2" is based on the default [...]
14/09/2020
42
Dear EMSA-Team, In Annex I.10 General terms and conditions for information technology contracts IV.8.4.2 [...]
The public link to Question #9 is: https://etendering.ted.europa.eu/qa/question.html?questionId=69079
10/09/2020
44
The performance requirements stipulate that the operational scenario must meet the following condition [...]
According to the Performance Requirements detailed in Section 11 of "Appendix 1 TS - Technical Requirements [...]
09/09/2020
43
Would EMSA accept that the response times REQ 105 to 108 correspond to query responses to the server [...]
Requirements REQ_105 to REQ_108 indicate the maximum acceptable delay of the service in response to some [...]
09/09/2020
41
Would you please confirm the scope of the training sessions? You state that it should cover SurvWebApp [...]
The scope of the Training Sessions is the use of the whole SurvSeaNet Web Appplication including LMV [...]
09/09/2020
40
Dear EMSA team, This question is related to UC-71 (RPAS catalog) of EN-Appendix 3 TS - Product Requirements.pdf [...]
There are no specific requirements related to the delay in the availability of live mission data in the [...]
04/09/2020
39
Dear EMSA team, Do you have the exposed API for development environment for the external systems that [...]
Any mock service or simulator used for development and testing activities are responsibility of the Contractor [...]
01/09/2020
38
Dear EMSA team, You mentioned live chat is for quickly communicate with Pilot. How can Pilot enter the [...]
As stated in section 3 of “Appendix 1 TS – Technical Requirements”, the Live Chat is a feature to quickly [...]
01/09/2020
37
Dear EMSA team, Is there any plan for the increasing of concurrent users, concurrent missions during [...]
The SurvWebApp shall be compliant with the Performance Requirements defined in Section 11 of "Appendix [...]
01/09/2020
36
Dear EMSA team, It is mentioned in the documentation that "Up to 20 concurrent users following the Missions [...]
The SurvSeaNet Web Application shall support up to 20 concurrent users for each Mission, i.e. a maximum [...]
01/09/2020
35
Dear EMSA team, What does "create workflow" in UC-6, UC-10 mean? Can you elaborate? From the Technical [...]
A workflow is a set of predefined sequence statuses and transitions that a record (Mission Schedule, [...]
01/09/2020
34
Hello EMSA team, Could you please provide us the "swagger file - index.html" in the document "EN-Appendix [...]
There was a problem when the PDF file "EN-Appendix 4 TS - ICD for Service Providers.pdf" was generated [...]
01/09/2020
33
Dear EMSA team, Please confirm that these points are out of scope of Module 1 or not: 1. “SEG Strategic [...]
As for the SEG Strategic View please see the answer to Question #18 (https://etendering.ted.europa.eu [...]
31/08/2020
32
Dear EMSA team, Section 6. Estimated Value of the Contract: Training Sessions are estimated to be requested [...]
As stated in Section 2.2.3 of "Annex B.02 Tender Specifications", each Presential Training Session shall [...]
31/08/2020
31
Dear EMSA team, Section 4. 4. Project Planning: Is there any special clearance (such as network or VPN [...]
Access to the EMSA Project Management and Ticketing Tool is made through the public internet using a [...]
31/08/2020