20
1.2.1 b) Offloading oil transfer system compatible with the oil storage barge Can the oil transfer pump [...]
"Detailed minimum requirements for the offloading oil transfer system are described under point 1.4 of [...]
05/05/2021
Answered
19
In the documents, the term "barge" is used without describing the requested product. Could you please [...]
The subject of the procurement is an inflatable, floating oil storage barge, intended for the storage [...]
29/04/2021
Answered
18
The updated/modified documents: EN-Enclosure 1 - Bid template Lot 1_001 and EN-Enclosure 2 - Bid template [...]
The word version of Enclosures 1 and 2 is now available in the following link https://etendering.ted.europa.eu [...]
27/04/2021
Answered
17
In the case of a Joint offer for Lot 1 does the payments due for a Specific Contract are being paid to [...]
The relevant payments for the performance of the specific contracts will be executed to one single bank [...]
27/04/2021
Answered
16
How many working cleaning boats have to be included in this lot?
Please note that as indicated in point 2.1 of the Tender Specifications, for lot 1 EMSA may decide to [...]
27/04/2021
Answered
15
Does transport platform includes the actual lorry carrying the transport platform? Or is the 4 meter [...]
"The total height of the complete system for road transport includes: - height of the working boat, - [...]
21/04/2021
Answered
14
After discussing with various engine manufacturers, none are capable of delivering an EU Stage IV or [...]
"The certification for the engine of the working boat about EU environmental requirements EU stage IV [...]
21/04/2021
Answered
13
Can the propulsion be with a petrol outboard?
"There are no minimum requirements regarding the type of fuel or location of the engine. However, under [...]
21/04/2021
Answered
12
Is “closed cooling system” referring to a keelcooling system with a heat exchanger at the bottom of the [...]
“Closed cooling system” refers to the system where the engine is cooled by a fresh water/coolant in a [...]
21/04/2021
Answered
11
Is 12 hours fuel autonomy fully loaded at minimum speed (ie 5 knots) or at maximum speed (ie. Max engine [...]
12 hours of the fuel autonomy means autonomy of the fully loaded working-boat at Maximum Continuous Rating [...]
21/04/2021
Answered