Call for tenders' details

Title:
EU Support to Intellectual Property Rights in Bosnia and Herzegovina - Supply
Contracting authority:
Directorate-General for Neighbourhood and Enlargement Negotiations (DG NEAR)
TED publication date:
18/10/2021
Time limit for receipt of tenders:
31/01/2022
Status:
Closed
Show filter parameters

Results per page: 10 | 25 | 50 57 Questions found, displaying 1 to 50.[First/Prev] 1, 2 [Next/Last]
# Question Answer Last publication date Status
57
Requested is the ability to add up to a minimum of 9 additional disk chassis-that is, the ability to [...]
See Clarification No.3 and Corrigendum No.2 to the Tender Dossier published under the tender Document [...]
19/01/2022
56
The specification states that storage must have a minimum of 4 x 16GbE host interface (minimum 2 com [...]
See Clarification No.3 and Corrigendum No.2 to the Tender Dossier published under the tender Document [...]
19/01/2022
55
The specification states that the offer should include: - Support for 512 snapshot copies - Virtual Copy [...]
See Clarification No.3 and Corrigendum No.2 to the Tender Dossier published under the tender Document [...]
19/01/2022
54
The specification states that the offer should include: Support for SSD, SAS, SATA, and NL-SAS disks. [...]
See Clarification No.3 and Corrigendum No.2 to the Tender Dossier published under the tender Document [...]
19/01/2022
53
The server specification does not include any host to bus adapter to be able to support SAN (storage [...]
See Clarification No.3 and Corrigendum No.2 to the Tender Dossier published under the tender Document [...]
19/01/2022
52
The specification states that offer should include: Connectivity: · 1 x 1Gb/s RJ45 Ethernet for out of [...]
See Clarification No.3 and Corrigendum No.2 to the Tender Dossier published under the tender Document [...]
19/01/2022
51
The specification states that the offer should include: Operating system: Pre-installed Server OS Software [...]
See Clarification No.3 and Corrigendum No.2 to the Tender Dossier published under the tender Document [...]
19/01/2022
50
Please consider to change request for communication: from „Communication slot for Network-MS card“ to [...]
See Clarification No.3 and Corrigendum No.2 to the Tender Dossier published under the tender Document [...]
19/01/2022
49
Is it necessary that „Dry contacts (DB9)“ communication card is already installed in UPS or we can offer [...]
See Clarification No.3 and Corrigendum No.2 to the Tender Dossier published under the tender Document [...]
19/01/2022
48
In the interests of transparency and equal treatment for all tenderers, please consider changing the [...]
See Clarification No.3 and Corrigendum No.2 to the Tender Dossier published under the tender Document [...]
19/01/2022
47
For the required racks the minimum dimension is 800mm wide and 1060mm depth. By setting such dimensions [...]
See Clarification No.3 and Corrigendum No.2 to the Tender Dossier published under the tender Document [...]
19/01/2022
46
Is it allowed to offer a storage system which supports only RAID levels with distributed spare capacity [...]
See Clarification No.3 and Corrigendum No.2 to the Tender Dossier published under the tender Document [...]
19/01/2022
45
Is it allowed to offer a storage system with more cache memory (32GB per controller) and the ability [...]
See Clarification No.3 and Corrigendum No.2 to the Tender Dossier published under the tender Document [...]
19/01/2022
44
What is the "Virtual Copy Support"? There is no industry standard functionality with this name related [...]
See Clarification No.3 and Corrigendum No.2 to the Tender Dossier published under the tender Document [...]
19/01/2022
43
What is the "Thin Rebuild" functionality? That term is mentioned only once in the data sheet of "HPE [...]
See Clarification No.3 and Corrigendum No.2 to the Tender Dossier published under the tender Document [...]
19/01/2022
42
Specification of "Supported RAID levels" is copied from "HPE MSA 2060 Storage Array" data-sheet and includes [...]
See Clarification No.3 and Corrigendum No.2 to the Tender Dossier published under the tender Document [...]
19/01/2022
41
Specified hard drives "6 x MSA 10TB 12G SAS 7.2K LFF Midline HDD" is copied from "HPE MSA 2060 Storage [...]
See Clarification No.3 and Corrigendum No.2 to the Tender Dossier published under the tender Document [...]
19/01/2022
40
Specification of "Cache memory" is directly copied from "HPE MSA 2060 Storage Array" data sheet. Please [...]
See Clarification No.3 and Corrigendum No.2 to the Tender Dossier published under the tender Document [...]
19/01/2022
39
Specification includes "Dual redundant controller", but what is the meaning of "automatic download mechanism [...]
See Clarification No.3 and Corrigendum No.2 to the Tender Dossier published under the tender Document [...]
19/01/2022
38
Can you provide us with information regarding preferred way of integration with the INES system, ie whether [...]
See Clarification No.3 and Corrigendum No.2 to the Tender Dossier published under the tender Document [...]
19/01/2022
37
Under the performance and functionality requirements for switch, it is stated as following: Minimum Switching [...]
See Clarification No.3 and Corrigendum No.2 to the Tender Dossier published under the tender Document [...]
19/01/2022
36
For which max. current are these PDUs provided: 10A or 16A?
See Clarification No.3 and Corrigendum No.2 to the Tender Dossier published under the tender Document [...]
19/01/2022
35
Can You be more specific regarding "Rack cooling", as there is a talk about Server Rack with Server Equipment [...]
See Clarification No.3 and Corrigendum No.2 to the Tender Dossier published under the tender Document [...]
19/01/2022
34
According to technical specification for the Communication; • 1 USB port and/or 1 RS232 or Network (RJ45 [...]
See Clarification No.3 and Corrigendum No.2 to the Tender Dossier published under the tender Document [...]
19/01/2022
33
LOT 2 – Item 2.1 - Is it acceptable to offer switch model which will provide 2 GB DRAM instead of required [...]
See Clarification No.3 and Corrigendum No.2 to the Tender Dossier published under the tender Document [...]
19/01/2022
32
In document "EN-c4b_itt_en new" in section 23. Tender guarantee, the amount of tender guarantee for LOT [...]
See Clarification No.3 and Corrigendum No.2 to the Tender Dossier published under the tender Document [...]
19/01/2022
31
According to technical specification of 3.3 item, "An appropriate lock with a contactless card reader [...]
See Clarification No.3 and Corrigendum No.2 to the Tender Dossier published under the tender Document [...]
19/01/2022
30
Q25: How do you expect from tenderer to make any reasonable estimate considering that technical specification [...]
See Clarification No.3 and Corrigendum No.2 to the Tender Dossier published under the tender Document [...]
19/01/2022
29
Q24: Will we be provided with remote access to infrastructure?
See Clarification No.3 and Corrigendum No.2 to the Tender Dossier published under the tender Document [...]
19/01/2022
28
Q23: Who will own Infrastructure management/operations? Will contracting body provide IT staff for Infrastructure [...]
See Clarification No.3 and Corrigendum No.2 to the Tender Dossier published under the tender Document [...]
19/01/2022
27
Q22: Is there any limitation regarding readines Stakeholders/institutions to involve in project?
See Clarification No.3 and Corrigendum No.2 to the Tender Dossier published under the tender Document [...]
19/01/2022
26
Q21: Do we need to work on site and if yes in which percent?
See Clarification No.3 and Corrigendum No.2 to the Tender Dossier published under the tender Document [...]
19/01/2022
25
Q20: Who will be representing contracting authority during implementation of project? How contracting [...]
See Clarification No.3 and Corrigendum No.2 to the Tender Dossier published under the tender Document [...]
19/01/2022
24
Q19: Administration module requirement “These ICT-applications can be either Commercial Off-The-Shelf [...]
See Clarification No.3 and Corrigendum No.2 to the Tender Dossier published under the tender Document [...]
19/01/2022
23
Q18: Administration module requirement “Administration of passwords and login procedures for the system [...]
See Clarification No.3 and Corrigendum No.2 to the Tender Dossier published under the tender Document [...]
19/01/2022
22
Q17: Administration module requirement “Inserting or removing options and objects from the interfaces [...]
See Clarification No.3 and Corrigendum No.2 to the Tender Dossier published under the tender Document [...]
19/01/2022
21
Q16: Can you provide more details for statement from Administration module requirements “Customizing [...]
See Clarification No.3 and Corrigendum No.2 to the Tender Dossier published under the tender Document [...]
19/01/2022
20
Q15: In Administration module is requirement “Changes to the application without having to change the [...]
See Clarification No.3 and Corrigendum No.2 to the Tender Dossier published under the tender Document [...]
19/01/2022
19
Q14: In statement “Ability to view, search and print individual "internal books" - In addition to all [...]
See Clarification No.3 and Corrigendum No.2 to the Tender Dossier published under the tender Document [...]
19/01/2022
18
Q13: In statement “Scanning, creating incoming mail, objects, and documents in digital form where they [...]
See Clarification No.3 and Corrigendum No.2 to the Tender Dossier published under the tender Document [...]
19/01/2022
17
Q12: For Document Management Module, can you be more specific on scanning requirements (Scanning Optical [...]
See Clarification No.3 and Corrigendum No.2 to the Tender Dossier published under the tender Document [...]
19/01/2022
16
Q11: In statement “Support for PKI digital signing of documents and records through the user interface [...]
See Clarification No.3 and Corrigendum No.2 to the Tender Dossier published under the tender Document [...]
19/01/2022
15
Q10: Can you provide mor details what should “Support for web services” include?
See Clarification No.3 and Corrigendum No.2 to the Tender Dossier published under the tender Document [...]
19/01/2022
14
Q9: Regarding the statement “Technologically independent system in accordance with the standards of open [...]
See Clarification No.3 and Corrigendum No.2 to the Tender Dossier published under the tender Document [...]
19/01/2022
13
Q8: Regarding the statement “Web user interface and compatibility with standard web browsers - the presentation [...]
See Clarification No.3 and Corrigendum No.2 to the Tender Dossier published under the tender Document [...]
19/01/2022
12
Q7: Can you please explain statement “Availability and complete functionality in work for any authenticated [...]
See Clarification No.3 and Corrigendum No.2 to the Tender Dossier published under the tender Document [...]
19/01/2022
11
Q6: Is there any restriction on which Relational Database Management System (RDBMS) can be used? Who [...]
See Clarification No.3 and Corrigendum No.2 to the Tender Dossier published under the tender Document [...]
19/01/2022
10
Q4: Can you provide technical documentation for existing INES software is used by the Indirect Tax?
See Clarification No.3 and Corrigendum No.2 to the Tender Dossier published under the tender Document [...]
19/01/2022
9
Q3: Can you give more information on existing INES software is used by the Indirect Tax: • What kind [...]
See Clarification No.3 and Corrigendum No.2 to the Tender Dossier published under the tender Document [...]
19/01/2022
8
Q5: Can you please elaborate in more detail following statement “Subset of data from the production databases [...]
See Clarification No.3 and Corrigendum No.2 to the Tender Dossier published under the tender Document [...]
19/01/2022