4
|
Please clarify if the deadline of 14 September is actually valid for both - offers and requests to participate [...]
|
The deadline of 14 September specified in the Contract Notice is the deadline to submit the technical [...]
|
07/09/2015
|
|
2
|
The point D 14 page 6 refers to the “control unit”. The ‘control unit’ shall be understood as the supervisor [...]
|
The control unit shall be able to connect to a SCADA system. Some specifications of the SCADA are available [...]
|
07/09/2015
|
|
3
|
At the point D14 page 6 is defined the container in which the batteries will be installed, but it is [...]
|
The AC/DC converter must not be in the same container with the batteries. The container is located outside [...]
|
07/09/2015
|
|
1
|
The point C9 page 6 refers on the containment system: container 20 ft. Is it possible to use even systems [...]
|
20 ft container is the maximum dimension, there is no problem by using a smaller container if the security [...]
|
07/09/2015
|
|
5
|
Where is it possible to find the Contract Notice and the templates of the administrative documents to [...]
|
On the site ‘'Ted - eTendering' please go to section ‘TED’. At the top, almost centrally there is a link [...]
|
07/09/2015
|
|
6
|
Question 1: In respect to the documents to be provided by the tenderer, including by the “sub-contractor [...]
|
1. Subcontractors shall submit the same documents as the main contractor; the document in copy for the [...]
|
07/09/2015
|
|
22
|
In the document “technical specification” on page 10 section 4 paragraph 1, it specifies that the delivery [...]
|
For both lots: Following a review of the technical specifications, we inform you that the delivery time [...]
|
09/09/2015
|
|
21
|
Therefore also the sub-contractors must submit: - cover letter - declaration of honor - document issued [...]
|
For both lots: Subcontractors identified as per heading III.1.3 of the Contract Notice must provide a [...]
|
09/09/2015
|
|
7
|
Question: In the document “Technical specifications” on page 8, third point, it refers to a range between [...]
|
The unit of measurement is VAR and not VOLTS. The correct values are -60kVAR < Q < +60kVAR for [...]
|
07/09/2015
|
|
8
|
Question: In the document “Technical Specifications” on page 8, point 7th, it is defined a complete cycle [...]
|
For the lot 1 the correct value is 150 KWh and not 1 MWh. For the lot 2 the correct value is 450 KWh [...]
|
07/09/2015
|
|
9
|
Question: In the document “Technical Specifications” on page 8, point 8th, Is the word ‘... 1 MWh capacity [...]
|
The maximum capacity for the lot 1 is 150 kWh and for lot 2 is 450 kWh. The complete cycle per day (24 [...]
|
07/09/2015
|
|
24
|
Referring to the Contract Notice, are the tender documents available in Italian?
|
The tender documents will be translated and provided in Italian. Time limit for receipt of tenders is [...]
|
07/09/2015
|
|
11
|
Referring to the Contract Notice, is it possible to submit the offer in Italian?
|
The tender may be drawn up in any official language of the European Union, including Italian.
|
07/09/2015
|
|
10
|
Referring to the Contract Notice, must the technical and financial offer be prepared in a free format [...]
|
The technical and financial offer must follow the structure indicated in the Administrative Annex at [...]
|
07/09/2015
|
|
12
|
Is the converter located in the enclosure indoor or outdoor? If it is placed in an open space, we have [...]
|
The converter in the enclosure will be place indoor (inside a building) There is no need for an extra [...]
|
08/09/2015
|
|
13
|
Can we submit a tender with a price above the estimated values indicated in the point II.2.1 and II.3 [...]
|
Yes, as the values mentioned at points II.2.1 and II.3 are only estimations. We kindly remind you that [...]
|
07/09/2015
|
|
18
|
Are continuous Power and Peak Power refer to AC (at the connection point with the network) or DC? Are [...]
|
B3 and B4 refer to AC power (at the connection point with the network) for both charging and discharging [...]
|
07/09/2015
|
|
19
|
Is the efficiency understood as the ratio between the energy consumed and the energy given during a work [...]
|
Efficiency relates to the instantaneous power of the converter (excluding battery). In B6 efficiency [...]
|
07/09/2015
|
|
20
|
Is the distribution switchboard intended to be placed inside each container component system?
|
If the offer includes several containers, each container shall be equipped with its own switchboard.
|
07/09/2015
|
|
16
|
Is the "separate box" intended as a separate room within the same container or cabinet / separated cabinet [...]
|
The "separate box" is a cabinet inside the container, it is not a separate room.
|
07/09/2015
|
|
17
|
Which can be considered the range of variability of the temperature inside the building, in the room [...]
|
Room temperature inside the building 5 °C - 30°C (winter –summer)
|
07/09/2015
|
|
15
|
The indications given about air conditioning systems for the power electronics also apply to the battery [...]
|
Yes
|
07/09/2015
|
|
14
|
What is meant by "including on the 1 MWh capacity" at the point on guarantee?
|
There is an error in this value (1MWh), the correct figure is 150kWh (for LOT1) and 450kWh (for LOT2) [...]
|
07/09/2015
|
|
34
|
In the formula for the calculation of liquid damages, the value of "d" is given by the sum of the total [...]
|
"d" refers to each duration mentioned in the article I.2.3. (respectively: 5 months, 2 years, twelve [...]
|
09/09/2015
|
|
25
|
Considering that today the updated version of the document "Technical Specifications" is not yet available [...]
|
Please see the answer to the question 24
|
07/09/2015
|
|
26
|
Referring to the procedure we ask for an extension of one month for the presentation of the tenders.
|
Please see the answer to the question 24
|
07/09/2015
|
|
23
|
Reffering to the documents required by the Administrative Annex, in "Document Library" are missing the [...]
|
Within the document "Invitation to tender" are mentioned the links to the forms.
|
07/09/2015
|
|
33
|
In the penultimate paragraph, what is meaning of the term "Smooth" relatively to connections and disconnections [...]
|
Please see the response to question 27
|
09/09/2015
|
|
27
|
What is the meaning of the term "Smooth" in relation to transitions between operations on-grid and off-grid [...]
|
"Smooth" means that the transition will be done without interruptions.
|
07/09/2015
|
|
29
|
Does 25 ° C refer to the outside temperature or to that of the equipment?
|
It refers to ambient temperature of the room(s) or container(s) where the different pieces of equipment [...]
|
07/09/2015
|
|
30
|
Is it possible to have a more detailed description of the 3 operating modes mentioned?
|
More information are available within the "explanatory and requirements details", page 7, 2nd point.
|
07/09/2015
|
|
32
|
Is it possible to have a description of critical and non-critical loads as well as the management mode [...]
|
Critical loads include specific systems that will remain operational during an outage. Typical "critical [...]
|
07/09/2015
|
|
31
|
Given the temperature range required, is it correct to say that the climate control system should be [...]
|
Yes, it is correct to consider that climate control system is required. Climate control system shall [...]
|
07/09/2015
|
|
28
|
Considering the need for air conditioning, is the degree of protection IP23 defined as the minimum acceptable [...]
|
IP23 is the requirement for acceptance and therefore the minimum acceptable protection for the container [...]
|
07/09/2015
|
|
39
|
In the document "Draft Contract supply and maintenance" on page 11 section II.1.7, relative point (a) [...]
|
By derogation to the provisions of the article II.1.7. "General provisions concerning supplies", the [...]
|
15/09/2015
|
|
35
|
Given that the two months of delivery of the materials are essential (see the answer to question 22), [...]
|
Please refer to the supplementary answer to the question 22
|
09/09/2015
|
|
36
|
Chiediamo altresì di confermare l’assenza di penali in caso di consegna del BESS oltre il limite dei [...]
|
Se il contraente non adempie gli obblighi contrattuali entro i termini fissati dal contratto, ferma restando [...]
|
14/09/2015
|
|
37
|
On page 4 of the technical specifications, it indicates that the system should permit a "smooth" and [...]
|
The system can be operated in 3 different modes (see requirements A4, A5, A6, B1, B9, C1, C5, C10 and [...]
|
14/09/2015
|
|
38
|
On page 4 of the technical specifications, it indicates that the system must permit a "smooth" and automatic [...]
|
An electromechanical switch is allowed as there is no negative impact for the technical requirements.
|
14/09/2015
|
|
40
|
Is it possible to participate in the tender as contractor and also being subcontractor for other contender [...]
|
Yes, providing that this situation does not hinder, limit or distort competition. The Contracting Authority [...]
|
17/09/2015
|
|
42
|
Regarding to the air conditioning system for the battery container, Is it possible to place the condensation [...]
|
Yes, as far as it respects the safety standards.
|
21/09/2015
|
|
44
|
According to the responses we have already received, the control system (PCS, transformer and parallel [...]
|
For lot 2, the size of the room that will host the control systems is shown in the Annex 1. However, [...]
|
22/09/2015
|
|
41
|
The file "EN-7-05 GridBOC Annex 1 to Technical Specifications lot 2.pdf" should refer to the site of [...]
|
This is because the headquarter of the IET institute is in Petten, The Netherlands. This is just for [...]
|
21/09/2015
|
|
43
|
In the tender document (EN-07-05 GRIDBOC Technical specifications Lot 2.pdf) figure 1 is shown the laboratory [...]
|
This supply does not include the SCADA system. The communication protocols supported by our SCADA system [...]
|
21/09/2015
|
|
45
|
Dear Sirs, we need to know you VAT Number for deliveries to European Commission, Joint Research Centre [...]
|
Whereas the Commission is, as a general rule, exempt from all taxes and duties (including VAT) (see article [...]
|
22/09/2015
|
|
48
|
At the point 6 in the Annex I of the contract it indicates that the system must have the CE Marking or [...]
|
The requirement "E6: CE Marking or equivalent" shall be read as "E6: CE Marking", as the equivalence [...]
|
23/09/2015
|
|
51
|
Point E6, annex I to contract, indicates that the system must be CE or equivalent, but if some components [...]
|
CE marking is a requirement for the whole supply and it has to be confirmed at the time of the acceptance [...]
|
24/09/2015
|
|
46
|
With reference to the procedure in question, herein, we request one week extension of the deadline for [...]
|
At this stage is not possible to extend the deadline for tender submission. The deadline for tender submission [...]
|
23/09/2015
|
|
47
|
With reference to the procurement procedure in question, we would like to have clarification on the definition [...]
|
Economic operators can submit a tender either as a sole tenderer or as partners in a consortium (with [...]
|
23/09/2015
|
|
49
|
Please confirm that any kind of civil works are excluded.
|
We confirm that any civil works are excluded.
|
24/09/2015
|
|