53
|
In the document "DRAFT SUPPLY AND MAINTENANCE CONTRACT" at page 21 in the article“II.14.5 Pre-financing[...]
|
Please refer to the article I.4 of the draft contract where it is not requested to provide a financial[...]
|
28/09/2015
|
|
52
|
In the document "DRAFT SUPPLY AND MAINTENANCE CONTRACT" at page 17 in the article "ARTICLE II.11 – LIQUIDATED[...]
|
"V" is the amount specified in Article I.3.1, for each stage. Please consider also the answer to the [...]
|
28/09/2015
|
|
51
|
Point E6, annex I to contract, indicates that the system must be CE or equivalent, but if some components[...]
|
CE marking is a requirement for the whole supply and it has to be confirmed at the time of the acceptance[...]
|
24/09/2015
|
|
50
|
Please confirm that the route of the cable already exists, and if so, can you indicate the path? Do you[...]
|
In respect to the DC cable that connects the outdoor unit with the indoor unit we will indicate the path[...]
|
24/09/2015
|
|
49
|
Please confirm that any kind of civil works are excluded.
|
We confirm that any civil works are excluded.
|
24/09/2015
|
|
48
|
At the point 6 in the Annex I of the contract it indicates that the system must have the CE Marking or[...]
|
The requirement "E6: CE Marking or equivalent" shall be read as "E6: CE Marking", as the equivalence [...]
|
23/09/2015
|
|
47
|
With reference to the procurement procedure in question, we would like to have clarification on the definition[...]
|
Economic operators can submit a tender either as a sole tenderer or as partners in a consortium (with[...]
|
23/09/2015
|
|
46
|
With reference to the procedure in question, herein, we request one week extension of the deadline for[...]
|
At this stage is not possible to extend the deadline for tender submission. The deadline for tender submission[...]
|
23/09/2015
|
|
45
|
Dear Sirs, we need to know you VAT Number for deliveries to European Commission, Joint Research Centre[...]
|
Whereas the Commission is, as a general rule, exempt from all taxes and duties (including VAT) (see article[...]
|
22/09/2015
|
|
44
|
According to the responses we have already received, the control system (PCS, transformer and parallel[...]
|
For lot 2, the size of the room that will host the control systems is shown in the Annex 1. However, [...]
|
22/09/2015
|
|
43
|
In the tender document (EN-07-05 GRIDBOC Technical specifications Lot 2.pdf) figure 1 is shown the laboratory[...]
|
This supply does not include the SCADA system. The communication protocols supported by our SCADA system[...]
|
21/09/2015
|
|
42
|
Regarding to the air conditioning system for the battery container, Is it possible to place the condensation[...]
|
Yes, as far as it respects the safety standards.
|
21/09/2015
|
|
41
|
The file "EN-7-05 GridBOC Annex 1 to Technical Specifications lot 2.pdf" should refer to the site of [...]
|
This is because the headquarter of the IET institute is in Petten, The Netherlands. This is just for [...]
|
21/09/2015
|
|
40
|
Is it possible to participate in the tender as contractor and also being subcontractor for other contender[...]
|
Yes, providing that this situation does not hinder, limit or distort competition. The Contracting Authority[...]
|
17/09/2015
|
|
39
|
In the document "Draft Contract supply and maintenance" on page 11 section II.1.7, relative point (a)[...]
|
By derogation to the provisions of the article II.1.7. "General provisions concerning supplies", the [...]
|
15/09/2015
|
|
38
|
On page 4 of the technical specifications, it indicates that the system must permit a "smooth" and automatic[...]
|
An electromechanical switch is allowed as there is no negative impact for the technical requirements.
|
14/09/2015
|
|
37
|
On page 4 of the technical specifications, it indicates that the system should permit a "smooth" and [...]
|
The system can be operated in 3 different modes (see requirements A4, A5, A6, B1, B9, C1, C5, C10 and[...]
|
14/09/2015
|
|
36
|
Chiediamo altresì di confermare l’assenza di penali in caso di consegna del BESS oltre il limite dei [...]
|
Se il contraente non adempie gli obblighi contrattuali entro i termini fissati dal contratto, ferma restando[...]
|
14/09/2015
|
|
35
|
Given that the two months of delivery of the materials are essential (see the answer to question 22),[...]
|
Please refer to the supplementary answer to the question 22
|
09/09/2015
|
|
22
|
In the document “technical specification” on page 10 section 4 paragraph 1, it specifies that the delivery[...]
|
For both lots: Following a review of the technical specifications, we inform you that the delivery time[...]
|
09/09/2015
|
|
34
|
In the formula for the calculation of liquid damages, the value of "d" is given by the sum of the total[...]
|
"d" refers to each duration mentioned in the article I.2.3. (respectively: 5 months, 2 years, twelve [...]
|
09/09/2015
|
|
33
|
In the penultimate paragraph, what is meaning of the term "Smooth" relatively to connections and disconnections[...]
|
Please see the response to question 27
|
09/09/2015
|
|
21
|
Therefore also the sub-contractors must submit: - cover letter - declaration of honor - document issued[...]
|
For both lots: Subcontractors identified as per heading III.1.3 of the Contract Notice must provide a[...]
|
09/09/2015
|
|
12
|
Is the converter located in the enclosure indoor or outdoor? If it is placed in an open space, we have[...]
|
The converter in the enclosure will be place indoor (inside a building) There is no need for an extra[...]
|
08/09/2015
|
|
11
|
Referring to the Contract Notice, is it possible to submit the offer in Italian?
|
The tender may be drawn up in any official language of the European Union, including Italian.
|
07/09/2015
|
|