14
|
Concerning the preparation of the roundtables (before the meeting), will the Contractor or the Contracting [...]
|
The standard procedure will be that Eurostat manages the invitation process up until confirmation, i.e [...]
|
03/02/2016
|
|
11
|
Could you please confirm that the tender should be presented in one single envelope (including all the [...]
|
Yes. We confirm that the tender should be presented in one single envelope (including all the following [...]
|
28/01/2016
|
|
8
|
Footnote 4 states that up to one high-level contributor from a continent other than Europe will participate [...]
|
There would be a great overlap between high-level contributors to the five Roundtables, and the high-level [...]
|
25/01/2016
|
|
12
|
If the proposed expert is not an employee, which documents should we present? Along with the legal entity [...]
|
The two model letters have identical content. The letter of availability for subcontractors is foreseen [...]
|
29/01/2016
|
|
13
|
In section 4.4.2 of the Tender Specifications it states that “Only on request, and for contracts of a [...]
|
The tenderer (including each partner in case of a joint tender) and each subcontractor must provide the [...]
|
01/02/2016
|
|
15
|
On page 7 of the ToR it is mentioned that travel expenses (incl. daily allowances) have to be reimbursed [...]
|
Only transportation (typically flights), accommodation and per diems are to be covered by the contractor [...]
|
03/02/2016
|
|
10
|
The contractor is expected to send invitation letters to delegates. Will the contractor need to identify [...]
|
The identification, selection and admission of participants to the main PfS conference is the responsibility [...]
|
28/01/2016
|
|
5
|
What is the expected size (number of pages) of each of the two reports? We refer to the actual 'content [...]
|
A maximum combined length of both reports of 250 pages could be foreseen. The aim is not to have very [...]
|
08/12/2015
|
|
7
|
What means of proof of fluency at level C1 or higher of the CEFR are acceptable in the evaluation?
|
As set out in the Technical Specifications for Criterion 4 (English knowledge), the CVs of team members [...]
|
21/01/2016
|
|
9
|
Will the contractor be responsible for the identification and invitation of potential participants to [...]
|
The identification and selection of participants to the Roundtables is the responsibility of Eurostat [...]
|
28/01/2016
|
|