Call for tenders' details

Please notice that a corrigendum has been brought to the tender specifications. For an overview regarding the update potential tenderers are invited to see the document "corrigendum to the ITT". Deadline for submission of tenders was extended by 19 of August 2013.
Title:
Framework contract for the operations and hosting services of the GNSS Service C...
Contracting authority:
European Commission, DG for Internal Market, Industry,Entrepreneurshipand SMEs (...
TED publication date:
11/06/2013
Time limit for receipt of tenders:
19/08/2013
Status:
Closed
Show filter parameters

Results per page: 10 | 25 | 50 25 Questions found, displaying 1 to 10.[First/Prev] 1, 2, 3 [Next/Last]
# Question Answer Last publication date Status
1
most recent figures are required but 2012 figures are still provisional. Please confirm whether economic [...]
As per Section no 5.2.2 of the Tender Specification, the tenderers should provide: a) A full copy of [...]
03/07/2013
2
Documents in DRL: can we propose mergers/optimisations?
Yes, provided that the mergers and optimisations are duly justified as explained is 6.10.2.
03/07/2013
3
Please confirm that an independent Power of Attorney per each member of the consortium can be provided [...]
Each member of the group should provide an independent Power of Attorney, as specified in section 2.7 [...]
03/07/2013
4
The DRL asks for a ‘product tree’. How should it be understood, as the catalogue of products generated [...]
The product tree should present the entirety of the products created or delivered under this contract [...]
03/07/2013
5
Please, confirm that the use of PSS and ECOS for financial proposals is optional.
As specified in the ITT, section 6.10.2.1, PSS-A1, PSS-A2 and PSS-A8 should be used. ECOS files do not [...]
03/07/2013
6
Will all documents referred in section 6.10.2 Product Assurance, Safety and Engineering Standards, be [...]
Yes
16/07/2013
7
Sections 6.8.3 (Key Operational Concept) and 6.8.4 (Operational Interfaces) of the SC1-SoW, include references [...]
The GNSS Service Centre will have an interface with the CS provider. The location of the CS provider [...]
16/07/2013
8
This document is not requested for the Hosting Service Contract (SC2). Is it relative to the overall [...]
As presented in the section 6.11, this document is needed for the Specific Contract N°1
16/07/2013
9
No input CSAR has been identified in the CISL. CSAR identified as a document to be completed in line [...]
CSAR is defined is annex 6.14 of the ITT. See section 2.19 Configuration Status Accounting Report (CSAR [...]
16/07/2013
10
Clarification required on the scope of all this documentary package. In the assumption this documents [...]
The tenderer should present his QMS plans, manual and procedures. It is up to the tenderer to present [...]
16/07/2013