1
|
The tender specifications, section 4.3.3, selection criterion no. 3 stipulates that all services shall [...]
|
In relation to your questions, and given the current uncertainties around the UK withdrawal of the EU [...]
|
12/03/2019
|
|
2
|
The type of equipment which is supposed to be hosted under the scope of the Service Tower hosting, might [...]
|
Some hardware appliances from 1U to 4 U and one full rack for specific services. - dedicated full rack [...]
|
12/03/2019
|
|
3
|
The tender specifications mention, that either a half or a full rack is supposed to be located in the [...]
|
Shared rack is possible.
|
12/03/2019
|
|
4
|
According to the design best practices in network architecture design, it is recommended to have the [...]
|
The Internet access from the datacenter is the preferred choice.
|
12/03/2019
|
|
5
|
Depending on the design of the solution, it might be beneficial for the future network solution, to have [...]
|
Unfortunately it is not possible to place components like firewall to ESMA premises, it is not physically [...]
|
12/03/2019
|
|
6
|
It would be very helpful for a accurate solution design, to better understand what services are supposed [...]
|
Remote access to ESMA for accessing ESMA ressources: Portail with links for : - emails - some applications [...]
|
12/03/2019
|
|
7
|
€4.5 million, does this cover the 5 years of the possible complete 10 years. Even brand-new hardware [...]
|
The maximum amount €4.5 million covers 10 years.
|
15/03/2019
|
|
8
|
Estimates needs for services, does this cover the estimated staff coverage within the building and if [...]
|
Estimated needs for services cover the estimated staff coverage within the building including the predictable [...]
|
15/03/2019
|
|
16
|
It is stated that the initial order to likely be LaaS and WaaS with internet to light up the building [...]
|
The initial order will cover basic connectivity aligned with the physical move to the building. No actual [...]
|
15/03/2019
|
|
17
|
What is the expected duration of the Transition-in period?
|
Transition-in period will start from the availability of the building (beginning of October) until the [...]
|
15/03/2019
|
|