Call for tenders' details

Please note that in the eSubmission homepage (Tendering data) the valid tendering dates are those in the second blue banner: tender deadline 31/07/2020 16:00; Opening of tenders: 03/08/2020 11:00. The warning refers to the old date 11/06/2020. Tenders submitted within 31/07/2020 16:00 will be considered in time. IMPORTANT Published in Questions&Answers tab clarifications on issues with uploading p7m offer files.
Title:
Retrofit of the Trigeneration System in JRC Ispra Site by Construction of a New ...
Contracting authority:
European Commission, Joint Research Centre - Ispra (JRC-IPR)
TED publication date:
10/03/2020
Time limit for receipt of tenders:
31/07/2020
Status:
Closed
Show filter parameters

Results per page: 10 | 25 | 50 180 Questions found, displaying 1 to 10.[First/Prev] 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15 [Next/Last]
# Question Answer Last publication date Status
144
With reference to document “Part 1 Administrative specification” point 3.2.3 Technical and professional[...]
The technical and professional capacity mentioned in criterion T3 can be satisfied by using one of the[...]
15/07/2020
130
"As per Technical Specification – Scope Description RE98005 - P.013273.2004, page 27, Note: ii. The following[...]
The preliminary design has recommended to keep into operation the transformers feeding the existing QGBT[...]
09/07/2020
20
On page 24 of document 3-P.013273.2004 RE98005_02 Technical Specification - Scope Description it indicates[...]
Regarding the configuration to be considered in the scope of the supply, it is a system with cooling [...]
05/05/2020
156
In page 25 doc. "3 - P.013273.2004 RE98005_02 Specifica tecnica rev1.docx.pdf” it is indicated: “Le dimensioni[...]
The heat recovered from engines is used to produce both hot and chilled water through absorption chillers[...]
20/07/2020
165
According to EN-03-Financial offer firm, following earthing grid material should be quoted: - 63mm2 copper[...]
The indicated sections are typical for reference, tender alignment purposes. The earthing material shall[...]
24/07/2020
162
According to EN-03-Financial offer firm, item 2.4.3.4 (FG16R16 0.6/1kV - 1x240 / 1x185) should be quoted[...]
All cable sections indicated are preliminary and must be calculated by contractor based on the actual[...]
24/07/2020
163
According to EN-03-Financial offer firm, two items 2.4.1.5 (supply and erection of PCC LV Switchboard[...]
Existing QE-TEC2 shall not be replaced in this project, only feeder in new QGBT-59A has to be envisaged[...]
24/07/2020
18
For the purpose of the QMT-14 cabin connection with the new QMT-59A cabin, the possibility of re-using[...]
It is described at par. 8.6.1. Grid connection of the main technical spec. The preliminary solution is[...]
05/05/2020
23
An extension of the time limit for submission of the tender is granted for a period of at least 30 days[...]
The Contracting authority is considering a rescheduling of the tender stage with a possibile extension[...]
12/05/2020
47
As part of Scope of Work (SOW) of the Bidder the Client is kindly requested to clarify if the HVAC System[...]
The bidder is not requested to include in the bid the HVAC of the climatised areas of the building
22/05/2020