4
Please clarify if the deadline of 14 September is actually valid for both - offers and requests to participate[...]
The deadline of 14 September specified in the Contract Notice is the deadline to submit the technical[...]
07/09/2015
Answered
2
The point D 14 page 6 refers to the “control unit”. The ‘control unit’ shall be understood as the supervisor[...]
The control unit shall be able to connect to a SCADA system. Some specifications of the SCADA are available[...]
07/09/2015
Answered
3
At the point D14 page 6 is defined the container in which the batteries will be installed, but it is [...]
The AC/DC converter must not be in the same container with the batteries. The container is located outside[...]
07/09/2015
Answered
1
The point C9 page 6 refers on the containment system: container 20 ft. Is it possible to use even systems[...]
20 ft container is the maximum dimension, there is no problem by using a smaller container if the security[...]
07/09/2015
Answered
5
Where is it possible to find the Contract Notice and the templates of the administrative documents to[...]
On the site ‘'Ted - eTendering' please go to section ‘TED’. At the top, almost centrally there is a link[...]
07/09/2015
Answered
6
Question 1: In respect to the documents to be provided by the tenderer, including by the “sub-contractor[...]
1. Subcontractors shall submit the same documents as the main contractor; the document in copy for the[...]
07/09/2015
Answered
22
In the document “technical specification” on page 10 section 4 paragraph 1, it specifies that the delivery[...]
For both lots: Following a review of the technical specifications, we inform you that the delivery time[...]
09/09/2015
Answered
21
Therefore also the sub-contractors must submit: - cover letter - declaration of honor - document issued[...]
For both lots: Subcontractors identified as per heading III.1.3 of the Contract Notice must provide a[...]
09/09/2015
Answered
7
Question: In the document “Technical specifications” on page 8, third point, it refers to a range between[...]
The unit of measurement is VAR and not VOLTS. The correct values are -60kVAR < Q < +60kVAR for [...]
07/09/2015
Answered
8
Question: In the document “Technical Specifications” on page 8, point 7th, it is defined a complete cycle[...]
For the lot 1 the correct value is 150 KWh and not 1 MWh. For the lot 2 the correct value is 450 KWh [...]
07/09/2015
Answered