Call for tenders' details

Title:
Horizon Europe Project: Implementation of the Aerodrome ‘Triple One’ Concept
Contracting authority:
European Union Aviation Safety Agency (EASA)
TED publication date:
11/02/2022
Time limit for receipt of tenders:
05/05/2022
Status:
Closed
Hide filter parameters
Filter parameters


Results per page: 10 | 25 | 50 16 Questions found, displaying 1 to 10.[First/Prev] 1, 2 [Next/Last]
# Question Answer Last publication date Status
16
Is there for tasks 5.1 and 5.2 a specific risk assessment methodology, risk residue expression and risk [...]
It is up to the contractor to propose the safety assessment methodology to be used. The risk assessments [...]
25/04/2022
15
We would like to point out here that it is no possible to transfer the copyright to the customer under [...]
Please note that the contract as such does not imply a transfer or acquisition of any copyright to the [...]
24/04/2022
14
Is it possibile to postpose the deadline to the 22nd of April?
Please note that as per Section 1.3 of the Procurement Documents, the time limit for receipt of tenders [...]
24/04/2022
13
This is also contemplated in section 2.4.2, where it is indicated that the duration of the contract will [...]
Yes, it is possible to propose a work schedule with an overall duration of less than 24 months, provided [...]
24/04/2022
12
Is it required to assess the different rulemaking processes/regulation of Member States of participating [...]
Yes, such assessment of national regulations is to be performed as part of Task 1.
24/04/2022
11
Are there specific tools or means of listing, analysis and/or presentation of results with which EASA [...]
No preferred method or tool to analyze or present RI occurrences is identified for the project.
24/04/2022
10
For the list and later analysis of contributory factors, is it expected or desired to use a specific [...]
The use of a specific taxonomy is not required. As far as practicable the analysis shall reuse existing [...]
24/04/2022
9
The review of the relevant safety reports (of the sampled aerodromes) in sub-task 2.4 is for incorporation [...]
Sub-task 2.4 addresses the local safety assessments performed, using the occurrence and SMS reports available [...]
24/04/2022
8
Do sub-tasks 2.2, 2.3, 2.4 comprise merely public sources, i.e. documentation such as research that can [...]
The known sources include safety occurrence repositories owned by aviation authorities (incl. EASA), [...]
24/04/2022
7
Does this include RI by vehicles or are these strictly RI/Loss SA by aircraft in which the vehicles were [...]
All types of situations involving loss of situational awareness by pilots or vehicle drivers need to [...]
24/04/2022