Call for tenders' details

Title:
Crowdsourcing: engaging communities effectively in food and feed risk assessment...
Contracting authority:
European Food Safety Authority (EFSA)
TED publication date:
21/10/2015
Time limit for receipt of tenders:
15/01/2016
Status:
Closed
The deadline to download documents of this call for tenders has been reached. The download of documents is not possible The deadline to download documents of this call for tenders has been reached. The download of documents is not possible
Hide filter parameters
Filter parameters


Results per page: 10 | 25 | 50 9 Questions found, displaying all Questions .
# Question Answer Last publication date Status
9
Dear Sir/Madam, you are requesting: "The tenderer must have generated an overall annual turnover of at[...]
Correction to the first sentence in the answer given above earlier today. The minimum requirement for[...]
08/01/2016
8
Re. the draft contract clause 11.15.1 it is not clear if a Pre-Financing Guarantee and Performance Guarantee[...]
This is EFSA draft standard contract. No pre-financing guarantee or performance guarantee will be required[...]
07/01/2016
7
No points seem to be allocated to the methodology for the inventory. Is this correct or is the inventory[...]
The inventory is subsumed within the feasibility study.
07/01/2016
6
The pilot study award only mentions the score for the systematic review. Is the 50 points only for the[...]
The 50 points are only referred to the methodology of the systematic review pilot study. Only the methodology[...]
07/01/2016
5
In relation to 2f: What do "different project types" relate to?
In point 2b the contractor is requested to identify communities and engagement approaches for each relevant[...]
26/11/2015
4
Should the pilot system cover all kinds of theoretically possible types or only the two chosen for the[...]
The pilot test phase should cover two among the three proposed pilot studies (3a, 3b, 3c).
26/11/2015
3
Regarding Objective 2g), can an overview of EFSA information architecture be made available?
Please find enclosed our catalogue of business identities and the matrix of the business entities and[...]
26/11/2015
2
The specifications 2g) will be heavily influenced by EFSA's information architecture, and it is challenging[...]
Point 2g) of the feasibility study should identify the information technology needs for each of the crowdsourcing[...]
26/11/2015
1
In addition, could the requirements Regarding Objective 3, will EFSA specify the topics to be addressed[...]
The topic to be addressed in the two pilot studies will be discussed with EFSA. On the basis of the findings[...]
26/11/2015