Call for tenders' details

Title:
Supply, installation and maintenance of 2 battery storage systems - 2 lots.
Contracting authority:
European Commission, Joint Research Centre (JRC)
TED publication date:
31/07/2015
Time limit for receipt of tenders:
28/09/2015
Status:
Closed
Hide filter parameters
Filter parameters


Results per page: 10 | 25 | 50 53 Questions found, displaying 11 to 20.[First/Prev] 1, 2, 3, 4, 5, 6 [Next/Last]
# Question Answer Last publication date Status
43
In the tender document (EN-07-05 GRIDBOC Technical specifications Lot 2.pdf) figure 1 is shown the laboratory [...]
This supply does not include the SCADA system. The communication protocols supported by our SCADA system [...]
21/09/2015
42
Regarding to the air conditioning system for the battery container, Is it possible to place the condensation [...]
Yes, as far as it respects the safety standards.
21/09/2015
41
The file "EN-7-05 GridBOC Annex 1 to Technical Specifications lot 2.pdf" should refer to the site of [...]
This is because the headquarter of the IET institute is in Petten, The Netherlands. This is just for [...]
21/09/2015
40
Is it possible to participate in the tender as contractor and also being subcontractor for other contender [...]
Yes, providing that this situation does not hinder, limit or distort competition. The Contracting Authority [...]
17/09/2015
39
In the document "Draft Contract supply and maintenance" on page 11 section II.1.7, relative point (a) [...]
By derogation to the provisions of the article II.1.7. "General provisions concerning supplies", the [...]
15/09/2015
38
On page 4 of the technical specifications, it indicates that the system must permit a "smooth" and automatic [...]
An electromechanical switch is allowed as there is no negative impact for the technical requirements.
14/09/2015
37
On page 4 of the technical specifications, it indicates that the system should permit a "smooth" and [...]
The system can be operated in 3 different modes (see requirements A4, A5, A6, B1, B9, C1, C5, C10 and [...]
14/09/2015
36
Chiediamo altresì di confermare l’assenza di penali in caso di consegna del BESS oltre il limite dei [...]
Se il contraente non adempie gli obblighi contrattuali entro i termini fissati dal contratto, ferma restando [...]
14/09/2015
35
Given that the two months of delivery of the materials are essential (see the answer to question 22), [...]
Please refer to the supplementary answer to the question 22
09/09/2015
22
In the document “technical specification” on page 10 section 4 paragraph 1, it specifies that the delivery [...]
For both lots: Following a review of the technical specifications, we inform you that the delivery time [...]
09/09/2015