31
|
Given the temperature range required, is it correct to say that the climate control system should be [...]
|
Yes, it is correct to consider that climate control system is required. Climate control system shall [...]
|
07/09/2015
|
|
14
|
What is meant by "including on the 1 MWh capacity" at the point on guarantee?
|
There is an error in this value (1MWh), the correct figure is 150kWh (for LOT1) and 450kWh (for LOT2) [...]
|
07/09/2015
|
|
27
|
What is the meaning of the term "Smooth" in relation to transitions between operations on-grid and off-grid [...]
|
"Smooth" means that the transition will be done without interruptions.
|
07/09/2015
|
|
18
|
Are continuous Power and Peak Power refer to AC (at the connection point with the network) or DC? Are [...]
|
B3 and B4 refer to AC power (at the connection point with the network) for both charging and discharging [...]
|
07/09/2015
|
|
28
|
Considering the need for air conditioning, is the degree of protection IP23 defined as the minimum acceptable [...]
|
IP23 is the requirement for acceptance and therefore the minimum acceptable protection for the container [...]
|
07/09/2015
|
|
25
|
Considering that today the updated version of the document "Technical Specifications" is not yet available [...]
|
Please see the answer to the question 24
|
07/09/2015
|
|
46
|
With reference to the procedure in question, herein, we request one week extension of the deadline for [...]
|
At this stage is not possible to extend the deadline for tender submission. The deadline for tender submission [...]
|
23/09/2015
|
|
26
|
Referring to the procedure we ask for an extension of one month for the presentation of the tenders.
|
Please see the answer to the question 24
|
07/09/2015
|
|
47
|
With reference to the procurement procedure in question, we would like to have clarification on the definition [...]
|
Economic operators can submit a tender either as a sole tenderer or as partners in a consortium (with [...]
|
23/09/2015
|
|
44
|
According to the responses we have already received, the control system (PCS, transformer and parallel [...]
|
For lot 2, the size of the room that will host the control systems is shown in the Annex 1. However, [...]
|
22/09/2015
|
|