# Question Answer Last publication date Status
15
The indications given about air conditioning systems for the power electronics also apply to the battery [...]
Yes
07/09/2015
14
What is meant by "including on the 1 MWh capacity" at the point on guarantee?
There is an error in this value (1MWh), the correct figure is 150kWh (for LOT1) and 450kWh (for LOT2) [...]
07/09/2015
13
Can we submit a tender with a price above the estimated values indicated in the point II.2.1 and II.3 [...]
Yes, as the values mentioned at points II.2.1 and II.3 are only estimations. We kindly remind you that [...]
07/09/2015
6
Question 1: In respect to the documents to be provided by the tenderer, including by the “sub-contractor [...]
1. Subcontractors shall submit the same documents as the main contractor; the document in copy for the [...]
07/09/2015
28
Considering the need for air conditioning, is the degree of protection IP23 defined as the minimum acceptable [...]
IP23 is the requirement for acceptance and therefore the minimum acceptable protection for the container [...]
07/09/2015
29
Does 25 ° C refer to the outside temperature or to that of the equipment?
It refers to ambient temperature of the room(s) or container(s) where the different pieces of equipment [...]
07/09/2015
30
Is it possible to have a more detailed description of the 3 operating modes mentioned?
More information are available within the "explanatory and requirements details", page 7, 2nd point.
07/09/2015
31
Given the temperature range required, is it correct to say that the climate control system should be [...]
Yes, it is correct to consider that climate control system is required. Climate control system shall [...]
07/09/2015
32
Is it possible to have a description of critical and non-critical loads as well as the management mode [...]
Critical loads include specific systems that will remain operational during an outage. Typical "critical [...]
07/09/2015
1
The point C9 page 6 refers on the containment system: container 20 ft. Is it possible to use even systems [...]
20 ft container is the maximum dimension, there is no problem by using a smaller container if the security [...]
07/09/2015