1
|
The point C9 page 6 refers on the containment system: container 20 ft. Is it possible to use even systems [...]
|
20 ft container is the maximum dimension, there is no problem by using a smaller container if the security [...]
|
07/09/2015
|
|
2
|
The point D 14 page 6 refers to the “control unit”. The ‘control unit’ shall be understood as the supervisor [...]
|
The control unit shall be able to connect to a SCADA system. Some specifications of the SCADA are available [...]
|
07/09/2015
|
|
3
|
At the point D14 page 6 is defined the container in which the batteries will be installed, but it is [...]
|
The AC/DC converter must not be in the same container with the batteries. The container is located outside [...]
|
07/09/2015
|
|
34
|
In the formula for the calculation of liquid damages, the value of "d" is given by the sum of the total [...]
|
"d" refers to each duration mentioned in the article I.2.3. (respectively: 5 months, 2 years, twelve [...]
|
09/09/2015
|
|
49
|
Please confirm that any kind of civil works are excluded.
|
We confirm that any civil works are excluded.
|
24/09/2015
|
|
17
|
Which can be considered the range of variability of the temperature inside the building, in the room [...]
|
Room temperature inside the building 5 °C - 30°C (winter –summer)
|
07/09/2015
|
|
23
|
Reffering to the documents required by the Administrative Annex, in "Document Library" are missing the [...]
|
Within the document "Invitation to tender" are mentioned the links to the forms.
|
07/09/2015
|
|
13
|
Can we submit a tender with a price above the estimated values indicated in the point II.2.1 and II.3 [...]
|
Yes, as the values mentioned at points II.2.1 and II.3 are only estimations. We kindly remind you that [...]
|
07/09/2015
|
|
35
|
Given that the two months of delivery of the materials are essential (see the answer to question 22), [...]
|
Please refer to the supplementary answer to the question 22
|
09/09/2015
|
|
4
|
Please clarify if the deadline of 14 September is actually valid for both - offers and requests to participate [...]
|
The deadline of 14 September specified in the Contract Notice is the deadline to submit the technical [...]
|
07/09/2015
|
|