Call for tenders' details

Title:
Supply, installation and maintenance of 2 battery storage systems - 2 lots.
Contracting authority:
European Commission, Joint Research Centre (JRC)
TED publication date:
31/07/2015
Time limit for receipt of tenders:
28/09/2015
Status:
Closed
Hide filter parameters
Filter parameters


Results per page: 10 | 25 | 50 53 Questions found, displaying 11 to 20.[First/Prev] 1, 2, 3, 4, 5, 6 [Next/Last]
# Question Answer Last publication date Status
9
Question: In the document “Technical Specifications” on page 8, point 8th, Is the word ‘... 1 MWh capacity [...]
The maximum capacity for the lot 1 is 150 kWh and for lot 2 is 450 kWh. The complete cycle per day (24 [...]
07/09/2015
24
Referring to the Contract Notice, are the tender documents available in Italian?
The tender documents will be translated and provided in Italian. Time limit for receipt of tenders is [...]
07/09/2015
11
Referring to the Contract Notice, is it possible to submit the offer in Italian?
The tender may be drawn up in any official language of the European Union, including Italian.
07/09/2015
10
Referring to the Contract Notice, must the technical and financial offer be prepared in a free format [...]
The technical and financial offer must follow the structure indicated in the Administrative Annex at [...]
07/09/2015
12
Is the converter located in the enclosure indoor or outdoor? If it is placed in an open space, we have [...]
The converter in the enclosure will be place indoor (inside a building) There is no need for an extra [...]
08/09/2015
13
Can we submit a tender with a price above the estimated values indicated in the point II.2.1 and II.3 [...]
Yes, as the values mentioned at points II.2.1 and II.3 are only estimations. We kindly remind you that [...]
07/09/2015
18
Are continuous Power and Peak Power refer to AC (at the connection point with the network) or DC? Are [...]
B3 and B4 refer to AC power (at the connection point with the network) for both charging and discharging [...]
07/09/2015
19
Is the efficiency understood as the ratio between the energy consumed and the energy given during a work [...]
Efficiency relates to the instantaneous power of the converter (excluding battery). In B6 efficiency [...]
07/09/2015
20
Is the distribution switchboard intended to be placed inside each container component system?
If the offer includes several containers, each container shall be equipped with its own switchboard.
07/09/2015
16
Is the "separate box" intended as a separate room within the same container or cabinet / separated cabinet [...]
The "separate box" is a cabinet inside the container, it is not a separate room.
07/09/2015