1
In section C - Annex 1 there are two formats of the tender submission form. Can you please inform if [...]
There is one submission form where you have to provide financial and professional data and references [...]
04/11/2019
2
Please confirm that the submission deadline is 15 November 2019 as indicated in the Instructions to Tenderers [...]
The deadline is 15 November 2019.
04/11/2019
3
In the tender instructions under point 5 Selection criteria it says "The reference period which will [...]
It is 5 years.
04/11/2019
4
Please can you clarify if Key Expert 2 is Solid Waste Key Expert as per Evaluation Grid, or if Key Expert [...]
KE2 is Wastewater and storm water key expert; KE3 is Solid waste sector expert.
04/11/2019
5
Please confirm the number of references that has to be submitted (Item 6 of the tender form). Please [...]
The maximum number of references to be presented as requested under 3a and 3b in Section 5 of the Instructions [...]
04/11/2019
6
Can you please confirm that the reference period for technical capacity of tenderer (ITT 5.3 a) and 5.3 [...]
It is 5 years.
04/11/2019
7
1) In the ITT, ‘3. Technical capacity of the tenderer’ the selection criteria mentions a reference period [...]
The reference period for the projects is 5 years. One original hardcopy and an electronic version should [...]
04/11/2019
8
1. The Contract Notice (ref 2019/S 182-442060) at Section II 1.4 states that “The purpose of this assignment [...]
As indicated in the Contract Notice, projects in South Africa are not eligible under this programme.
04/11/2019
9
The document ‘Annex V: Budget’ requests that tenderers provide a price breakdown based on the outputs [...]
All expenditures that are not described under Section 6.6 of the Terms of Reference as eligible incidental [...]
04/11/2019
10
On page 13 of the ToR, under section 4.2.5 Lessons learnt and knowledge sharing (all stages), as deliverables [...]
The contracting Authority confirms that in total 2 regional workshops are expected to be organised.
04/11/2019
11
On page 10 point 4.2.1 of the ToR it is stated that: "The Consultant will identify and propose a pipeline [...]
The contracting Authority confirms that there is no pre-defined ratio between the three sectors other [...]
04/11/2019
12
According to p. 13 of the ToR: "Special surveys such as topographic, geological, geotechnical, environmental [...]
The contracting Authority confirms that all costs for special surveys are to be included in the Global [...]
04/11/2019
13
Could you please confirm the deadline to submit our technical and Financial offers ? Is it the 12 or [...]
The deadline for submitting the offers is the 15th of November 2019, 23:59 CET. A corrigendum will be [...]
04/11/2019
14
In regard to the Technical capacity of the tenderer (Selection criteria 5.3), could you please confirm [...]
The Contracting Authority confirms that the reference period for the project presented as references [...]
04/11/2019
15
On page 18 of the ToR (Section 6.2 Support Staff and Backstopping) it is stated that "the CVs of the [...]
The Contracting Authority confirms that the same format of CV as for the Key experts must be used.
04/11/2019
15
• The Annex V: Budget defines five interim payments, which make the total amount of the financial proposal [...]
The contractual payment conditions are described in Article 7 of the Special Conditions of the Service [...]
04/11/2019
16
• Could you confirm our understanding of the following points of the TOR: § 4.2.2: “The Consultant will [...]
Yes, the Consultant will prepare the draft of the Terms of reference and then carry out the related studies [...]
04/11/2019
17
• Could you confirm our understanding that the five pilot projects may be defined as the finally selected [...]
As specified in the Terms of Reference , the Consultant shall carry out one small scale pilot project [...]
04/11/2019
18
• We understand that “The region to be covered comprises the eligible ACP countries in Sub-Saharan Africa [...]
Yes, The contracting Authority confirms that Madagascar, Comoros and Cape Verde Islands are included [...]
04/11/2019
19
• Instruction to tenderers, §3: Can you clarify whether the references must be less than five or three [...]
The Contracting Authority confirms that the reference period for the project presented as references [...]
04/11/2019
20
• Considering the content and the different aspects of the Terms of Reference, we would like to be able [...]
The deadline for submitting the offers remains on 15 November 2019, 23:59 CET.
04/11/2019
21
The consultant will do at least 20 project fiches, 10 pre-feasibility studies and 5 feasibility studies [...]
Out of the 10 pre-feasibility, 5 will be subject to a feasibility study. If at a later stage, and outside [...]
04/11/2019
22
Can EIB confirm that the General Conditions of Contract that are part of this tender are identical to [...]
The General Conditions included in the tender dossier are those that will apply to this Service Contract [...]
04/11/2019
23
We see several references to the Special Conditions of Contract (inter alia in the GCC, but also in TOR [...]
The Special Conditions of the Service Contract are provided in the Tender Dossier (File named: “Draft [...]
04/11/2019
24
We notice that incidental expenditures shall not be used for surveys as part of the Identification, pre-feasibility [...]
Yes., the contracting Authority confirms that surveys are expected to be required but the extent will [...]
04/11/2019
25
We notice that there is a standard formulation that the project is free of taxes. It is our experience [...]
The Consultant might be exempt from direct and indirect taxes in the countries where it will have to [...]
04/11/2019
26
For purpose of tax calculation, kindly provide us with information on: 1 the time expressed in months [...]
Please refer to the preceding answers.Question25
04/11/2019
27
Please clarify the deadline of the proposal's submission. (The eTendering indicates as deadline: 12/11 [...]
The deadline for submitting the offers is the 15th of November 2019, 23:59 CET. A corrigendum will be [...]
04/11/2019
28
The Instructions to tenders indicate the deadline for submission of tenders to be 15/11/2019, whereas [...]
The deadline for submitting the offers is the 15th of November 2019, 23:59 CET. A corrigendum will be [...]
04/11/2019
29
We note that there is the provision in the contract for pre-financing, with the requirement for a pre-financing [...]
The template is provided on the Document Library under the name: “Declarations and other Templates - [...]
04/11/2019
30
Could you please clarify if South Africa is included in the project? The contract notice excludes South [...]
Yes, the Contracting Authority confirms that South Africa is excluded from the scope of this programme [...]
04/11/2019
31
Our consortium notes, pursuant to information contained in the TOR, that the tax and customs arrangements [...]
The Consultant might be exempt from direct & indirect taxes (e.g. VAT, income tax) in the countries [...]
04/11/2019
32
In the Instructions to tender it is stated that "Deadline for receipt of tenders by the Contracting Authority [...]
The deadline for submitting the offers is the 15th of November 2019, 23:59 CET. A corrigendum will be [...]
04/11/2019
33
On the TED platform the Project name is given as "Technical Assistance Facility for the Clean Ocean Initiative [...]
While both names can be referred to, we suggest to use the following name: The Clean Oceans Initiative [...]
04/11/2019
34
Refering to AA-010039-001 TAINSTRUCT 5.3 "The Reference period which will be taken into account will [...]
The Contracting Authority confirms that the reference period for the project presented as references [...]
04/11/2019
35
Ref ToR § 6.6 p19: we understand that the implementation of the 5 pilot projects will be financed by [...]
Yes the cost for implementation of the pilot projects shall be covered under the incidental costs. The [...]
04/11/2019
36
Reference to TAINSTRUCT Chapter 22 and Annex 9: Usually foreign companies must register in the project [...]
The Consultant might be exempt from direct and indirect taxes in the countries where it will have to [...]
04/11/2019
37
The EIB will propose 5 potential project ideas. 1/ In which countries would these projects be located [...]
The contracting Authority confirms that this information is not available at this stage and will be communicated [...]
04/11/2019
38
Please provide the list of countries and cities, where EIB has regional representation
This information is available from EIB web site (https://www.eib.org/en/infocentre/contact/offices/index.htm [...]
04/11/2019
39
CVs for non-key experts are not requested and will not be evaluated. How do you expect the Tenderer to [...]
Information pertaining to the access to non-key experts will be evaluated as part of the Organisation [...]
04/11/2019
40
The Tender provides a budget and the number of projects to be delivered by the consultant at each stage [...]
The bidders will have to explain in their methodology how they intend to scope the projects so that they [...]
04/11/2019
41
Projects being effective regarding Clean Oceans are expected to have a significant size and may also [...]
Possible types of surveys are indicated in the Terms of Reference section 4.2.3. As stated, the costs [...]
04/11/2019
42
The Annex V : BUDGET indicates clearly the number of projects: - 20 projects identified - 10 projects [...]
The consultant may identify and propose more than the minimum number of projects at each stage allowing [...]
04/11/2019
43
Ref ToR § 6.3 page 18: Are the key experts (in particular the KE1 Team leader), and the non key experts [...]
Please refer to the Terms of Reference, Section 6.1 which states: “Each of the key experts are allowed [...]
04/11/2019
44
Can we assume that (selected) project will not be situated in high risk countries and/or regions? If [...]
Projects should be selected in locations and countries where the likelihood for successful preparation [...]
04/11/2019
45
Can you confirm that the fields in which (at least 20 of) the permanent staff of the tenderer are required [...]
The Contracting Authority confirms that the permanent staff of the tenderer are required to work are: [...]
04/11/2019
46
Can you please specify the reference period (since reference is made to ‘the last three years from submission [...]
The Contracting Authority confirms that the reference period for the project presented as references [...]
04/11/2019
47
Ref to ToR 6.1: “Each of the key experts are allowed to spend a maximum of 30% of their time allocated [...]
It is the responsibility of the Consultant to provide suitable working conditions to its staff for the [...]
04/11/2019
48
Can you confirm that only one original Technical offer and Financial offer have to be submitted?
The Technical offers and the financial offers must be submitted in separate envelopes (double envelope [...]
04/11/2019
49
Can you please indicate what you do consider as “The electronic version of the technical offer” that [...]
The Technical offers and the financial offers must be submitted in separate envelopes (double envelope [...]
04/11/2019