10
|
The provided new draft contract still has some references to "this Frame Work Contract" (e.g. in I.11.1 [...]
|
The first paragraph of the article I.11.1. Detailed list of modes of exploitation of the results, shall [...]
|
07/08/2019
|
|
9
|
The desired results are a value added product of the source satellite data. The provider requests the [...]
|
The users/use of the Time Stacks and Imagettes are defined in the Technical Specifications and in the [...]
|
30/07/2019
|
|
8
|
Section 2.2.3. of the Technical Specification document require, that " The contractor, shall deliver [...]
|
The sample of the input data will be provided before the kick off meeting, immediately after the contract [...]
|
29/07/2019
|
|
7
|
At page 6 of the Technical Specification document it is requested, that "Each of the 8 points shall contain [...]
|
The requirement presented at page 8 is correct presented and interpreted. The text present at page 6 [...]
|
25/07/2019
|
|
6
|
Referring to the award criteria stated in the contract notice under II.2.5): Can you confirm that „Price [...]
|
As stipulated in the Contract Notice, section II.2.5) the Award criteria is price only. Also please see [...]
|
25/07/2019
|
|
5
|
In the Contract Notice under II.2.7), it is stated „Duration in months: 12“. In the Administrative Annex [...]
|
The duration of the contract is 6 months. The updated Contract Notice is under publication.
|
23/07/2019
|
|
4
|
In relation to the spatial resolution requested: Is pansharpening allowed in order to achieve the required [...]
|
No, it is not accepted.The panchromatic band is not allowed to be used, for pan sharpening, in order [...]
|
23/07/2019
|
|
3
|
Concerning the location of the parcels to be covered within the MS regions listed in the Technical Specifications [...]
|
The shape files, annex to the Technical Specifications, have been uploaded.
|
23/07/2019
|
|
2
|
Do we know minimum and maximum areas of relevant plots and their location?
|
The estimated min/max areas of parcels to be provided as time stacks are: min 0.01 ha/max 0.2 ha. The [...]
|
22/07/2019
|
|
1
|
Does JRC waits for the tenderer to obtain the satellite imagery or does he supply this?
|
The JRC will not supply the satellite imagery.
|
19/07/2019
|
|