101
|
In the 'Technical Specifications' document it is stated that a completed Annex III (Declaration of honour [...]
|
The e-submission platform is designed in a way that it is compulsory to upload a Declaration on Honour [...]
|
27/08/2019
|
|
100
|
In this section you ask for '1 small clinical waste bin and 1 sharp bin in the first aid room'. These [...]
|
The Agency cannot remove the supply and servicing of clinical waste bins and sharp bins from the requirements [...]
|
22/08/2019
|
|
99
|
In this section you ask for '25 x Sharp bins for each disabled toilet'. Are you sure you want sharpbins [...]
|
The requests for 25 sharp bins for each disabled toilet is based on what was in use in the Agency’s previous [...]
|
22/08/2019
|
|
98
|
In this section you ask for 47 Enzyme and urinal sleeves for each urinal. Can you specify this product [...]
|
The urinals are not waterless. The Agency does not prescribe the type of product to be used; this will [...]
|
22/08/2019
|
|
97
|
Hand soap has been added to the Costing sheet in sheet 1 (Cleaning services) in section 2: Consumables [...]
|
A new costing sheet (v.4) has been published in which the formula is corrected. Tenderers must use this [...]
|
21/08/2019
|
|
96
|
Can you provide us with an indication of the m2 of carpet in the building?
|
Please see the answer to question 93 and 94, as well as Annex XX (Additional information), which has [...]
|
20/08/2019
|
|
95
|
Thanks for providing us with the floor types. To compile an accurate calculation however, an indication [...]
|
Please see the answer to question 93 and 94, as well as Annex XX (Additional information), which has [...]
|
20/08/2019
|
|
94
|
In order to provide you with an accurate price for deep cleaning, the following information is required [...]
|
For the requested information, please see Annex XX: Additional information, which has been published [...]
|
20/08/2019
|
|
93
|
In order to determine an accurate price for cleaning services, the following information is required: [...]
|
For the requested information, please see Annex XX: Additional information. Please note that further [...]
|
20/08/2019
|
|
92
|
What is the width of the access road to expedition/’Milieustraat’? Can you confirm that waste collector [...]
|
The size of the truck that can enter the expedition road and area is limited to the size as specified [...]
|
19/08/2019
|
|
91
|
Will you accept a tender that is signed by a person who has been authorised in writing by one of the [...]
|
This is correct indeed, the Agency will accept a tender that is signed by a person who has been authorised [...]
|
13/08/2019
|
|
90
|
In your answer on question 43 you state that the contract start date is foreseen to be 01 December ‘19 [...]
|
Please see the response to question 87.
|
13/08/2019
|
|
89
|
Are the costs of supplying the vending machines for the tenderer? If so, what is the expected consumption [...]
|
As per annex II (Costing sheet) the tenderers must include in their quote the cost of provision and maintenance [...]
|
13/08/2019
|
|
88
|
There are no bins asked for the hand towels. In our opinion it’s necessary to add bins especially for [...]
|
Please see the answer to question 86. Bins are provided in the building.
|
13/08/2019
|
|
87
|
The start date of the contract is foreseen to be 01 December 2019. Can you confirm that this is the date [...]
|
This understanding is correct: the start of the contact will be the start date of the contract implementation [...]
|
13/08/2019
|
|
86
|
Definition of sanitary unit: A sanitary unit is a room in your building that contains several toilets [...]
|
Please see the new annex ‘XIX’ (Specifications of sanitary units) which has been published with additional [...]
|
13/08/2019
|
|
85
|
Is it an option / is there any room to place a 'molok' (underground container) to limit the transportations [...]
|
No, there is no space available for a ‘molok’ type of container.
|
13/08/2019
|
|
84
|
Article II.16.1 of the FWC states that the contracting authority is entitled to reduce or reclaim the [...]
|
Please note that in case of lack of performance or underperformance by the contractor (Article II.16.1 [...]
|
12/08/2019
|
|
83
|
A definition of 'force majeure' is included in article II.1 of the FWC. It states that strikes are in [...]
|
Please note the Agency is aware and takes into consideration applicable limitations stemming from Dutch [...]
|
12/08/2019
|
|
82
|
Article II.15 contains a formula for the calculation of the delay damage that the contractor owes if [...]
|
Please note EMA is obliged to include liquidated damages clause (i.e. provision II.15) in the award contract [...]
|
12/08/2019
|
|
81
|
On the one hand, contractor believes that there must be a possibility for liability on the part of the [...]
|
Please note Article II.6.1. draft framework contract refers to contracting authority not being liable [...]
|
12/08/2019
|
|
80
|
Article II.6.3 states that the contractor is liable for all damage. In our opinion however, liability [...]
|
Please see the response to question 79.
|
12/08/2019
|
|
79
|
Article II 6.3 states that the contractor is liable for all loss or damage suffered by the contracting [...]
|
Please note that the exact reading of this article is the following: The contractor is liable for any [...]
|
12/08/2019
|
|
78
|
For the indexation of prices you use a European standard which is serverely different than the usual [...]
|
Please see the response to question 77.
|
12/08/2019
|
|
77
|
The tender, including prices, must be valid for 6 months. Due to fluctuations on the waste market however [...]
|
As set out in Article I.5.2 (Price revision index) of the draft framework contract (Annex II to the Technical [...]
|
12/08/2019
|
|
76
|
Why do you ask for a different frequency of replacing the bins on the (MIVA) invalid tiolet?
|
The frequency of replacing the bins is based on the Agency’s previous experience. Frequency could be [...]
|
09/08/2019
|
|
75
|
Does the tenderer correctly understand that in part two a price must be entered for the consumbles requested [...]
|
Yes, the understanding is correct; the quotes for consumables should not include dispensers.
|
09/08/2019
|
|
74
|
We do not find any soap at the sanitary consumables in the costing sheet. Can you indicate why you are [...]
|
Hand soap has been added to the Costing sheet in sheet 1 (Cleaning services) in section 2: Consumables [...]
|
09/08/2019
|
|
73
|
You indicate at the sanitary consumables that the toilet paper must have a length of 240 cm. Do we assume [...]
|
Please refer to question 22.
|
09/08/2019
|
|
72
|
Is there an obligation to take over members of the current cleaning staff?
|
Please be informed that the EMA is currently making use of a fully serviced temporary accommodation, [...]
|
09/08/2019
|
|
71
|
According the demands of WELL and BREEAM, we would like to offer products which meets these demands. [...]
|
Tenderers must submit quotes according to the specifications to ensure fair comparison between tenders [...]
|
09/08/2019
|
|
70
|
Tenderers can insert suggested machines “compactors/containers/pressers” in Annex II Costing sheet under [...]
|
A new Costing sheet (v.3) has been published for tenderers where relevant cells have been unblocked. [...]
|
09/08/2019
|
|
69
|
You are requesting an all-in price per kilogram. This is not common practise in the Netherlands. Is it [...]
|
A new Costing sheet (v.3) has been published to enable tenderers to enter their quotes for a management [...]
|
09/08/2019
|
|
68
|
In question 2 you have given us indicative measures per floor. In this list, the measures of floor 3 [...]
|
Please see below rectification: Floor 4 to 18: standard offices floors: surface 1,350 – 1,435 m2 + bathrooms [...]
|
08/08/2019
|
|
67
|
The penalty clause in Annex XVI states that the fine is immediately due and payable when the service [...]
|
Please see answer to question 34. A penalty is applied if the contractor fails to comply with the KPI [...]
|
07/08/2019
|
|
66
|
We have noticed that floor 2 is missing from your overview. Can you please provide the details for this [...]
|
It is not clear to the Agency which overview is meant. Could the economic operator clarify this please [...]
|
07/08/2019
|
|
65
|
The costing sheet does not specify a required method for processing/destruction of confidential paper [...]
|
As per technical specifications the destruction of confidential waste (including paper) has to be in [...]
|
07/08/2019
|
|
64
|
From our own experience we believe that the recycling station in your new building will be too small [...]
|
Tenderers are requested to present a proposal in line with the Agency requirements. Extra space could [...]
|
07/08/2019
|
|
63
|
You are requesting rental prices as well as purchase prices for waste bins. For the presses and for organic [...]
|
In those cases the applicable rows of column G in sheet 2. Waste management shall be left blank. Please [...]
|
07/08/2019
|
|
62
|
Oil: can you please let us know which types of oil are being used at EMA, for example frying oil, engine [...]
|
Cooking oil will be used in the provision of the catering and hospitality services. The use of any other [...]
|
07/08/2019
|
|
61
|
The average return on a cleaning contract in the Netherlands is approximately 5%. A 10% penalty for a [...]
|
The Agency is unable to negotiate the terms of the SLA.
|
07/08/2019
|
|
60
|
Can you please confirm that the penalties do not apply when a service cannot be provided according to [...]
|
As per article II.14 Force Majeure of the draft contract: II.14.1 If a party is affected by force majeure [...]
|
07/08/2019
|
|
59
|
You state that all employees proposed by the tenderer will have to be in the possession of a VOG. Does [...]
|
As per the point on vetting and screening in section 3.2 (Minimum requirements to be met by the tender [...]
|
07/08/2019
|
|
58
|
In your RFP nothing is mentioned in regard to outside areas. Does this mean that outside areas are not [...]
|
The annual price for daily cleaning should include the main entrance area, access route, staircases and [...]
|
07/08/2019
|
|
57
|
Operational compliance & risk - KPI contract Can you please confirm that the penalty does not apply [...]
|
Penalties shall be applied in line with the output measure “all contracted hours provided during the [...]
|
07/08/2019
|
|
56
|
Is our assumption correct that the evidence required to evaluate financial feasibility is not part of [...]
|
In section 14.2 of the technical specifications it is stated that tenderers shall as part of their tender [...]
|
07/08/2019
|
|
55
|
We know from our own experience that the waste collection drawers that you intend to use are very small [...]
|
The Agency is unable to change the design of the collection drawers at this stage. As per the technical [...]
|
07/08/2019
|
|
54
|
Can you define what you mean by ‘food compactor’? Pressing swill/organic waste is not recommended, a [...]
|
‘Food compactor’ is synonymous with ‘food digester’. As per the technical specifications, the offered [...]
|
07/08/2019
|
|
53
|
To calculate the number of hours required for waste collection, the following information is required [...]
|
Please note that the EMA building is still a construction site, and the Agency does not have at its disposal [...]
|
07/08/2019
|
|
52
|
In order to collect waste efficiently we need a minimum of 2 and rather 3 high voltage power connections [...]
|
As per point d) central waste collection of section 3.1.5 (Waste management including confidential waste [...]
|
07/08/2019
|
|