55
|
Dear EMSA team, on section 2.1.1 Video Transmission Protocol (page 2/17), could you please clarify the [...]
|
This is a clerical error, this sentence is not relevant. The corrected 2nd paragraph of Section 2.1.1 [...]
|
17/09/2020
|
|
54
|
Dear EMSA team, on section 2.2 Real Time HTTPS API (page 6/17), could you please clarify the reference [...]
|
This is a clerical error, the text inside the brackets is not relevant. The corrected 2nd paragraph of [...]
|
17/09/2020
|
|
53
|
Dear EMSA, on section 2.1.1 from the document "EN-Appendix 4 TS - ICD for Service Providers_001.pdf", [...]
|
Yes, an RPAS can transmit data from two or more sensors simultaneously and the SurvSeaNet Web Application [...]
|
17/09/2020
|
|
52
|
Dear EMSA team, the complete Mission Analysis could be delivered as part of the contractor infrastructure [...]
|
See answer to Question #48 (https://etendering.ted.europa.eu/qa/question.html?questionId=70415)
|
14/09/2020
|
|
51
|
EN-Appendix+4+TS+-+ICD+for+Service+Providers_001.pdf, Paragraph 2.3, page 10 speaks of a chat XMPP server [...]
|
The use of an XMPP server is not mandatory. It is up to the Tenderer to propose the technical solutions [...]
|
14/09/2020
|
|
50
|
On Figure 5 in EN-Appendix+1+TS+-+Technical+Requirements.pdf, page 13, a couple of components mention [...]
|
This is a clerical error. The acronym "RPW" should be replaced with "SurvWebApp".
|
14/09/2020
|
|
49
|
EN-Appendix+4+TS+-+ICD+for+Service+Providers_001.pdf, Paragraph 2.4, page 11 speaks of an FTPS server [...]
|
The Document Repository does not need to support the FTPS protocol. It is up to the Tenderer to propose [...]
|
14/09/2020
|
|
48
|
The SurvWebApp System Architecture (EN-Appendix+1+TS+-+Technical+Requirements.pdf, Chapter 6, pages 6 [...]
|
The Tenderer may propose a hybrid model for the DMAP, however, EMSA shall be able to fully manage the [...]
|
14/09/2020
|
|
47
|
Following EMSA's clarification dated 25/08/2020 we would like to request the following clarification: [...]
|
Your understanding is correct, however, EMSA must be able to autonomously install, configure, and operate [...]
|
14/09/2020
|
|
46
|
Dear EMSA team, in continuity with question and answer number 4, which LMV instances should be connected [...]
|
As stated in the answer to Question #4, the two environments required are the Pre-Production and Production [...]
|