1
|
We note from the T1.2 and T2.2 requirements in the Stage 1 Admin Spec document (pages 18-23) that for [...]
|
The language certificate for the level required may be replaced by a declaration on honour. A declaration [...]
|
31/01/2022
|
|
2
|
- Test content is provided by EPSO and remains its exclusive property: Will EPSO provide the formatted [...]
|
EPSO provides test items, not formatted test forms. It is the contractor’s responsibility to publish [...]
|
15/02/2022
|
|
3
|
-- Do all tests need to be accessible via any listed device? For example, does EPSO envisage that Proctored [...]
|
-No, this depends on the test type. -While general Smartphone compatibility is desired, priorities can [...]
|
15/02/2022
|
|
4
|
- EPSO informs the contractor of the parameters of an exam at least 1 month before the first day of testing [...]
|
-Usually a period of at least 1 month will be applied.However, in case of retesting candidates of a given [...]
|
15/02/2022
|
|
5
|
- When working with third party vendors: Who will be responsible for co-ordinating the integration of [...]
|
-Contractor will be responsible for coordinating and integration of third-party test drivers. EPSO will [...]
|
15/02/2022
|
|
6
|
- What do you mean by 'taking control' of the testing device? Please describe ‘control’ - Can EPSO elaborate [...]
|
-Taking control of the testing device means imposing lockdown conditions on the device. The procedure [...]
|
15/02/2022
|
|
7
|
- Can EPSO provide full details of the data that needs to be included in the test results? - Can EPSO [...]
|
-No, but here are some examples of data to be included: candidate unique ID, chosen reply to questions [...]
|
15/02/2022
|
|
8
|
- Will all staff providing the Candidate contact service need to be located in the EU / EEA? - Will there [...]
|
-Stipulations of the Regulation (EU) No 2018/1725 must be always met. According point 2.1.13 DTA Protection [...]
|
15/02/2022
|
|
9
|
- Is it the expectation that the contractor will produce any ‘videos or interactive’ content at their [...]
|
The Contractor is not expected to produce videos or interactive content other than standard material [...]
|
15/02/2022
|
|
10
|
- After initial support and training of EPSO personnel has been provided is it the expectation that EPSO [...]
|
In section 2.1.9 "Training and support", the tender stipulates : “at least once at the beginning of the [...]
|
15/02/2022
|
|