Details zur Ausschreibung

Please note that in the eSubmission homepage (Tendering data) the valid tendering dates are those in the second blue banner: tender deadline 31/07/2020 16:00; Opening of tenders: 03/08/2020 11:00. The warning refers to the old date 11/06/2020. Tenders submitted within 31/07/2020 16:00 will be considered in time. IMPORTANT Published in Questions&Answers tab clarifications on issues with uploading p7m offer files.
Titel:
Modernisierung des Kraft-Wärme-Kälte-Kopplungssystems am Standort der JRC Ispra ...
Öffentlicher Auftraggeber:
European Commission, Joint Research Centre - Ispra (JRC-IPR)
Datum der Veröffentlichung im TED:
10/03/2020
Frist für den Eingang von Angeboten:
31/07/2020
Status:
Geschlossen
Filter-Parameter anzeigen

Results per page: 10 | 25 | 50 180 Fragen found, displaying 141 to 150.[First/Prev] 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18 [Next/Last]
# Frage Antwort Datum der letzten Veröffentlichung Status
41
Considering MT 59A and QGBT 59A single-line wiring diagrams, how should the contemporaneity of transformers [...]
Question is not clear, please clarify
18/05/2020
40
Is it possible to have technical datasheets of the existing 2 MVA auxiliaries transformers and the 2 [...]
Datasheets are attached to the tender documents, the contractor can find technical data therein
18/05/2020
39
It is stated that the SS14 substation electric panel will manage the island mode operation. Is it possible [...]
The schematics of the panel are added to the tender documents. The control logics for the electrical [...]
18/05/2020
38
What is the “cosphi” value considered with reference to the 1500 kWe power output?
Rated power factor shall be 0,8 according to RE98005 §8.3.2.
18/05/2020
37
With reference to the list of documents in "EN-05-Tender specifications_Part 2_Technical specifications [...]
il documento pertinente è stato caricato
15/05/2020
36
We are kindly ask to confirm that with regard to the professional capacity requirements set out in criterion [...]
l'esperienza professionale maturata nel settore è già inserita tra i requisiti del punto T3. Tale esperienza [...]
15/05/2020
35
Good morning, with reference to the above procedure, clarification is needed on the following points: [...]
Il criterio T2 stabilisce che ciascuno dei quattro profili professionali identificati si richiede qualificazione [...]
14/05/2020
34
The plan shows N ° 2 tanks for the fresh lubricating oil of the engines of 3 cubic meters each. Confirmation [...]
Il disegno LY92003 (vedere figura in calce) mostra un serbatoio interrato per lo stoccaggio dell’olio [...]
13/05/2020
33
Will the compressed air for the new system be made available by the existing system? If yes, please indicate [...]
Si richiede un nuovo sistema dedicato - vedi doc. RE9800, §4.2.1 – dove, tra le varie apparecchiature [...]
13/05/2020
32
To cover the new building, two expansion tanks are indicated for the hot water and chilled water circuits [...]
Anche se mostrato solo negli elaborati grafici e non nei P&ID, il progetto preliminare prevede l’ [...]
13/05/2020