# Question Answer Last publication date Status
24
55.1.5 As per item 1.1, but EI90, height approx. 2.35 m (PV5); without acoustic requirements [ml] Installation [...]
24/01/2017
22
Could you elaborate on the concept of "valeur hors terrain et hors sol du projet " in document " PE_- [...]
It refers to the overall cost of the aboveground part of the project (without subsoil) and without the [...]
19/01/2017
23
Following your reply to question 22, we have interpreted that the " montant des travaux réellement exécutés [...]
The " montant des travaux réellement exécutés par le soumissionnaire '' refers to the part of the value [...]
19/01/2017
21
Hello. Are the documents referred to in points 13.1 to 13.3 to be supplied with the tender, or are they [...]
1) In accordance with point 13.7 of the Specifications, ‘... the European Parliament accepts the declaration [...]
03/01/2017
20
Hello. Can you provide us with an area in which to unload lorries close to the goods lifts? Will the [...]
No, there will not necessarily be an unloading area next to the goods lifts. Horizontal transfer from [...]
03/01/2017
19
55.1.6 Melamine coating for the partitioning The description states that the cladding should be approximately [...]
For the section of frame above the door, the panel height must be roughly 42 cm, elsewhere the panels [...]
03/01/2017
18
1.8. Door components (7.) Climatic classification for wooden doors Minimum requirement to be met/evidenced [...]
Confirmation: Climatic classification 2b in accordance with DIN EN 12219 for wooden doors.
03/01/2017
16
1.8.(2.) Wooden door The description makes a distinction in thickness between the door leaves according [...]
Tenderers must indicate in the tender what thickness of door panel they consider necessary to achieve [...]
03/01/2017
15
1.8.(2.) Wooden door Contradiction between the thickness mentioned in this article and detailed plan [...]
Tenderers must indicate in the tender what thickness of door panel they consider necessary to achieve [...]
03/01/2017
14
1.8.(2.) Wooden door Composition of the door leaf: Lacquered finish contradicts the description in the [...]
The doors must be glazed.
03/01/2017