Call for tenders' details

Title:
E-beam Evaporator Integrated in a Glovebox for the Preparation of U235 Targets
Contracting authority:
European Commission, Joint Research Centre - Geel (JRC-GEE)
TED publication date:
29/05/2019
Time limit for receipt of tenders:
03/07/2019
Status:
Closed
Show filter parameters

Results per page: 10 | 25 | 50 10 Questions found, displaying all Questions .
# Question Answer Last publication date Status
10
Do we need to offer a water chiller for the cooling, or do you have your own water housing for the cooling [...]
Yes, as mentioned in section 11. Cooling, the cooling system for the crucible, e-beam and the turbo pump [...]
26/06/2019
9
Do we have to provide the tubular device?
Yes, the tubular device must be provided. For clarification purposes, the Technical Specifications have [...]
26/06/2019
7
Is it possible to use a standard rotation feedthrough (that will be modified for the RF power), instead [...]
If specific problems are expected for a ferrofluidic feedthrough in combination with RF and as long as [...]
14/06/2019
8
A ferrofluidic feedthrough will not carry RF power. In our experience the special feedthrough we use [...]
As long as the required vacuum conditions are not affected (also after over time) there is no problem [...]
14/06/2019
6
If filament change is a critical parameter for the FAT and should be performed with gloves, we would [...]
The filament change can also be simulated by wearing gloves and respecting the geometry limits of the [...]
13/06/2019
5
Can we use a full magnetic rotational feedthrough instead of a ferrofluidic feedthrough?
If the full magnetic rotational feedthrough provides enough torque in case a planetary carrousel should [...]
13/06/2019
4
It is mentioned that all electronics should fit underneath the GB. Is this a requirement or can it be [...]
Due to the total size of the glovebox and the limited laboratory space the electronics should fit underneath [...]
13/06/2019
3
When you ask for technical drawings (e.g., point 2 'Process/Vacuum chamber'), do you mean that these [...]
The requested technical drawings are not part of the bid. Only after the first phase of the contract, [...]
12/06/2019
2
For the FATs (point 16 in the technical requirements), can these be in different locations for the glovebox [...]
Yes, the FATs can be in different locations for the glovebox setup and deposition tools.
12/06/2019
1
For the glovebox, can the windows be made of sapphire coated polycarbonate, instead of PMMA?
Yes, the windows can be made of sapphire coated polycarbonate.
12/06/2019