Call for tenders' details

Title:
Supply, installation and maintenance of 2 battery storage systems - 2 lots.
Contracting authority:
European Commission, Joint Research Centre (JRC)
TED publication date:
31/07/2015
Time limit for receipt of tenders:
28/09/2015
Status:
Closed
Hide filter parameters
Filter parameters


Results per page: 10 | 25 | 50 53 Questions found, displaying 11 to 20.[First/Prev] 1, 2, 3, 4, 5, 6 [Next/Last]
# Question Answer Last publication date Status
51
Point E6, annex I to contract, indicates that the system must be CE or equivalent, but if some components [...]
CE marking is a requirement for the whole supply and it has to be confirmed at the time of the acceptance [...]
24/09/2015
48
At the point 6 in the Annex I of the contract it indicates that the system must have the CE Marking or [...]
The requirement "E6: CE Marking or equivalent" shall be read as "E6: CE Marking", as the equivalence [...]
23/09/2015
36
Chiediamo altresì di confermare l’assenza di penali in caso di consegna del BESS oltre il limite dei [...]
Se il contraente non adempie gli obblighi contrattuali entro i termini fissati dal contratto, ferma restando [...]
14/09/2015
44
According to the responses we have already received, the control system (PCS, transformer and parallel [...]
For lot 2, the size of the room that will host the control systems is shown in the Annex 1. However, [...]
22/09/2015
47
With reference to the procurement procedure in question, we would like to have clarification on the definition [...]
Economic operators can submit a tender either as a sole tenderer or as partners in a consortium (with [...]
23/09/2015
26
Referring to the procedure we ask for an extension of one month for the presentation of the tenders.
Please see the answer to the question 24
07/09/2015
46
With reference to the procedure in question, herein, we request one week extension of the deadline for [...]
At this stage is not possible to extend the deadline for tender submission. The deadline for tender submission [...]
23/09/2015
25
Considering that today the updated version of the document "Technical Specifications" is not yet available [...]
Please see the answer to the question 24
07/09/2015
28
Considering the need for air conditioning, is the degree of protection IP23 defined as the minimum acceptable [...]
IP23 is the requirement for acceptance and therefore the minimum acceptable protection for the container [...]
07/09/2015
18
Are continuous Power and Peak Power refer to AC (at the connection point with the network) or DC? Are [...]
B3 and B4 refer to AC power (at the connection point with the network) for both charging and discharging [...]
07/09/2015