51
|
Point E6, annex I to contract, indicates that the system must be CE or equivalent, but if some components [...]
|
CE marking is a requirement for the whole supply and it has to be confirmed at the time of the acceptance [...]
|
24/09/2015
|
|
48
|
At the point 6 in the Annex I of the contract it indicates that the system must have the CE Marking or [...]
|
The requirement "E6: CE Marking or equivalent" shall be read as "E6: CE Marking", as the equivalence [...]
|
23/09/2015
|
|
36
|
Chiediamo altresì di confermare l’assenza di penali in caso di consegna del BESS oltre il limite dei [...]
|
Se il contraente non adempie gli obblighi contrattuali entro i termini fissati dal contratto, ferma restando [...]
|
14/09/2015
|
|
44
|
According to the responses we have already received, the control system (PCS, transformer and parallel [...]
|
For lot 2, the size of the room that will host the control systems is shown in the Annex 1. However, [...]
|
22/09/2015
|
|
47
|
With reference to the procurement procedure in question, we would like to have clarification on the definition [...]
|
Economic operators can submit a tender either as a sole tenderer or as partners in a consortium (with [...]
|
23/09/2015
|
|
26
|
Referring to the procedure we ask for an extension of one month for the presentation of the tenders.
|
Please see the answer to the question 24
|
07/09/2015
|
|
46
|
With reference to the procedure in question, herein, we request one week extension of the deadline for [...]
|
At this stage is not possible to extend the deadline for tender submission. The deadline for tender submission [...]
|
23/09/2015
|
|
25
|
Considering that today the updated version of the document "Technical Specifications" is not yet available [...]
|
Please see the answer to the question 24
|
07/09/2015
|
|
28
|
Considering the need for air conditioning, is the degree of protection IP23 defined as the minimum acceptable [...]
|
IP23 is the requirement for acceptance and therefore the minimum acceptable protection for the container [...]
|
07/09/2015
|
|
18
|
Are continuous Power and Peak Power refer to AC (at the connection point with the network) or DC? Are [...]
|
B3 and B4 refer to AC power (at the connection point with the network) for both charging and discharging [...]
|
07/09/2015
|
|