Call for tenders' details

Title:
Supply, installation and maintenance of 2 battery storage systems - 2 lots.
Contracting authority:
European Commission, Joint Research Centre (JRC)
TED publication date:
31/07/2015
Time limit for receipt of tenders:
28/09/2015
Status:
Closed
Hide filter parameters
Filter parameters


Results per page: 10 | 25 | 50 53 Questions found, displaying 41 to 50.[First/Prev] 1, 2, 3, 4, 5, 6 [Next/Last]
# Question Answer Last publication date Status
1
The point C9 page 6 refers on the containment system: container 20 ft. Is it possible to use even systems[...]
20 ft container is the maximum dimension, there is no problem by using a smaller container if the security[...]
07/09/2015
2
The point D 14 page 6 refers to the “control unit”. The ‘control unit’ shall be understood as the supervisor[...]
The control unit shall be able to connect to a SCADA system. Some specifications of the SCADA are available[...]
07/09/2015
3
At the point D14 page 6 is defined the container in which the batteries will be installed, but it is [...]
The AC/DC converter must not be in the same container with the batteries. The container is located outside[...]
07/09/2015
34
In the formula for the calculation of liquid damages, the value of "d" is given by the sum of the total[...]
"d" refers to each duration mentioned in the article I.2.3. (respectively: 5 months, 2 years, twelve [...]
09/09/2015
49
Please confirm that any kind of civil works are excluded.
We confirm that any civil works are excluded.
24/09/2015
17
Which can be considered the range of variability of the temperature inside the building, in the room [...]
Room temperature inside the building 5 °C - 30°C (winter –summer)
07/09/2015
23
Reffering to the documents required by the Administrative Annex, in "Document Library" are missing the[...]
Within the document "Invitation to tender" are mentioned the links to the forms.
07/09/2015
13
Can we submit a tender with a price above the estimated values indicated in the point II.2.1 and II.3[...]
Yes, as the values mentioned at points II.2.1 and II.3 are only estimations. We kindly remind you that[...]
07/09/2015
35
Given that the two months of delivery of the materials are essential (see the answer to question 22),[...]
Please refer to the supplementary answer to the question 22
09/09/2015
4
Please clarify if the deadline of 14 September is actually valid for both - offers and requests to participate[...]
The deadline of 14 September specified in the Contract Notice is the deadline to submit the technical[...]
07/09/2015