16
|
Is the "separate box" intended as a separate room within the same container or cabinet / separated cabinet [...]
|
The "separate box" is a cabinet inside the container, it is not a separate room.
|
07/09/2015
|
|
30
|
Is it possible to have a more detailed description of the 3 operating modes mentioned?
|
More information are available within the "explanatory and requirements details", page 7, 2nd point.
|
07/09/2015
|
|
32
|
Is it possible to have a description of critical and non-critical loads as well as the management mode [...]
|
Critical loads include specific systems that will remain operational during an outage. Typical "critical [...]
|
07/09/2015
|
|
4
|
Please clarify if the deadline of 14 September is actually valid for both - offers and requests to participate [...]
|
The deadline of 14 September specified in the Contract Notice is the deadline to submit the technical [...]
|
07/09/2015
|
|
35
|
Given that the two months of delivery of the materials are essential (see the answer to question 22), [...]
|
Please refer to the supplementary answer to the question 22
|
09/09/2015
|
|
13
|
Can we submit a tender with a price above the estimated values indicated in the point II.2.1 and II.3 [...]
|
Yes, as the values mentioned at points II.2.1 and II.3 are only estimations. We kindly remind you that [...]
|
07/09/2015
|
|
23
|
Reffering to the documents required by the Administrative Annex, in "Document Library" are missing the [...]
|
Within the document "Invitation to tender" are mentioned the links to the forms.
|
07/09/2015
|
|
17
|
Which can be considered the range of variability of the temperature inside the building, in the room [...]
|
Room temperature inside the building 5 °C - 30°C (winter –summer)
|
07/09/2015
|
|
49
|
Please confirm that any kind of civil works are excluded.
|
We confirm that any civil works are excluded.
|
24/09/2015
|
|
34
|
In the formula for the calculation of liquid damages, the value of "d" is given by the sum of the total [...]
|
"d" refers to each duration mentioned in the article I.2.3. (respectively: 5 months, 2 years, twelve [...]
|
09/09/2015
|
|
3
|
At the point D14 page 6 is defined the container in which the batteries will be installed, but it is [...]
|
The AC/DC converter must not be in the same container with the batteries. The container is located outside [...]
|
07/09/2015
|
|
2
|
The point D 14 page 6 refers to the “control unit”. The ‘control unit’ shall be understood as the supervisor [...]
|
The control unit shall be able to connect to a SCADA system. Some specifications of the SCADA are available [...]
|
07/09/2015
|
|
1
|
The point C9 page 6 refers on the containment system: container 20 ft. Is it possible to use even systems [...]
|
20 ft container is the maximum dimension, there is no problem by using a smaller container if the security [...]
|
07/09/2015
|
|
33
|
In the penultimate paragraph, what is meaning of the term "Smooth" relatively to connections and disconnections [...]
|
Please see the response to question 27
|
09/09/2015
|
|
39
|
In the document "Draft Contract supply and maintenance" on page 11 section II.1.7, relative point (a) [...]
|
By derogation to the provisions of the article II.1.7. "General provisions concerning supplies", the [...]
|
15/09/2015
|
|
19
|
Is the efficiency understood as the ratio between the energy consumed and the energy given during a work [...]
|
Efficiency relates to the instantaneous power of the converter (excluding battery). In B6 efficiency [...]
|
07/09/2015
|
|
15
|
The indications given about air conditioning systems for the power electronics also apply to the battery [...]
|
Yes
|
07/09/2015
|
|
40
|
Is it possible to participate in the tender as contractor and also being subcontractor for other contender [...]
|
Yes, providing that this situation does not hinder, limit or distort competition. The Contracting Authority [...]
|
17/09/2015
|
|
43
|
In the tender document (EN-07-05 GRIDBOC Technical specifications Lot 2.pdf) figure 1 is shown the laboratory [...]
|
This supply does not include the SCADA system. The communication protocols supported by our SCADA system [...]
|
21/09/2015
|
|
24
|
Referring to the Contract Notice, are the tender documents available in Italian?
|
The tender documents will be translated and provided in Italian. Time limit for receipt of tenders is [...]
|
07/09/2015
|
|
11
|
Referring to the Contract Notice, is it possible to submit the offer in Italian?
|
The tender may be drawn up in any official language of the European Union, including Italian.
|
07/09/2015
|
|
10
|
Referring to the Contract Notice, must the technical and financial offer be prepared in a free format [...]
|
The technical and financial offer must follow the structure indicated in the Administrative Annex at [...]
|
07/09/2015
|
|
42
|
Regarding to the air conditioning system for the battery container, Is it possible to place the condensation [...]
|
Yes, as far as it respects the safety standards.
|
21/09/2015
|
|
29
|
Does 25 ° C refer to the outside temperature or to that of the equipment?
|
It refers to ambient temperature of the room(s) or container(s) where the different pieces of equipment [...]
|
07/09/2015
|
|
20
|
Is the distribution switchboard intended to be placed inside each container component system?
|
If the offer includes several containers, each container shall be equipped with its own switchboard.
|
07/09/2015
|
|