7
Question: In the document “Technical specifications” on page 8, third point, it refers to a range between[...]
The unit of measurement is VAR and not VOLTS. The correct values are -60kVAR < Q < +60kVAR for [...]
07/09/2015
Answered
3
At the point D14 page 6 is defined the container in which the batteries will be installed, but it is [...]
The AC/DC converter must not be in the same container with the batteries. The container is located outside[...]
07/09/2015
Answered
2
The point D 14 page 6 refers to the “control unit”. The ‘control unit’ shall be understood as the supervisor[...]
The control unit shall be able to connect to a SCADA system. Some specifications of the SCADA are available[...]
07/09/2015
Answered
1
The point C9 page 6 refers on the containment system: container 20 ft. Is it possible to use even systems[...]
20 ft container is the maximum dimension, there is no problem by using a smaller container if the security[...]
07/09/2015
Answered
32
Is it possible to have a description of critical and non-critical loads as well as the management mode[...]
Critical loads include specific systems that will remain operational during an outage. Typical "critical[...]
07/09/2015
Answered
31
Given the temperature range required, is it correct to say that the climate control system should be [...]
Yes, it is correct to consider that climate control system is required. Climate control system shall [...]
07/09/2015
Answered
30
Is it possible to have a more detailed description of the 3 operating modes mentioned?
More information are available within the "explanatory and requirements details", page 7, 2nd point.
07/09/2015
Answered
29
Does 25 ° C refer to the outside temperature or to that of the equipment?
It refers to ambient temperature of the room(s) or container(s) where the different pieces of equipment[...]
07/09/2015
Answered
28
Considering the need for air conditioning, is the degree of protection IP23 defined as the minimum acceptable[...]
IP23 is the requirement for acceptance and therefore the minimum acceptable protection for the container[...]
07/09/2015
Answered
6
Question 1: In respect to the documents to be provided by the tenderer, including by the “sub-contractor[...]
1. Subcontractors shall submit the same documents as the main contractor; the document in copy for the[...]
07/09/2015
Answered