7
|
Question: In the document “Technical specifications” on page 8, third point, it refers to a range between [...]
|
The unit of measurement is VAR and not VOLTS. The correct values are -60kVAR < Q < +60kVAR for [...]
|
07/09/2015
|
|
3
|
At the point D14 page 6 is defined the container in which the batteries will be installed, but it is [...]
|
The AC/DC converter must not be in the same container with the batteries. The container is located outside [...]
|
07/09/2015
|
|
2
|
The point D 14 page 6 refers to the “control unit”. The ‘control unit’ shall be understood as the supervisor [...]
|
The control unit shall be able to connect to a SCADA system. Some specifications of the SCADA are available [...]
|
07/09/2015
|
|
1
|
The point C9 page 6 refers on the containment system: container 20 ft. Is it possible to use even systems [...]
|
20 ft container is the maximum dimension, there is no problem by using a smaller container if the security [...]
|
07/09/2015
|
|
32
|
Is it possible to have a description of critical and non-critical loads as well as the management mode [...]
|
Critical loads include specific systems that will remain operational during an outage. Typical "critical [...]
|
07/09/2015
|
|
31
|
Given the temperature range required, is it correct to say that the climate control system should be [...]
|
Yes, it is correct to consider that climate control system is required. Climate control system shall [...]
|
07/09/2015
|
|
30
|
Is it possible to have a more detailed description of the 3 operating modes mentioned?
|
More information are available within the "explanatory and requirements details", page 7, 2nd point.
|
07/09/2015
|
|
29
|
Does 25 ° C refer to the outside temperature or to that of the equipment?
|
It refers to ambient temperature of the room(s) or container(s) where the different pieces of equipment [...]
|
07/09/2015
|
|
28
|
Considering the need for air conditioning, is the degree of protection IP23 defined as the minimum acceptable [...]
|
IP23 is the requirement for acceptance and therefore the minimum acceptable protection for the container [...]
|
07/09/2015
|
|
6
|
Question 1: In respect to the documents to be provided by the tenderer, including by the “sub-contractor [...]
|
1. Subcontractors shall submit the same documents as the main contractor; the document in copy for the [...]
|