Call for tenders' details

Title:
Direct supplies contract to replace the boiler system for the 'Fuel Cell' facili...
Contracting authority:
European Commission, Joint Research Centre (JRC)
TED publication date:
01/03/2017
Time limit for receipt of tenders:
11/04/2017
Status:
Closed
Show filter parameters

Results per page: 10 | 25 | 50 5 Questions found, displaying all Questions .
# Question Answer Last publication date Status
1
We would like to know if it is possible to have all the documents translated into English.
The English tender documents will be made available as soon as possible.
02/03/2017
2
During the site visit it has been indicated that outside, within 3 metres of the facade, a gate valve [...]
Gas pipe material PVC Polycal, 110 mm.
30/03/2017
3
What is the Central Heating (CH) capacity of the existing CH group radiators low rising building?
The CH capacity is unknown; the existing pump (type Grundfos UMC 50-60) has sufficient capacity for the [...]
30/03/2017
4
What is the CH capacity of the existing CH group Ventilation?
The CH capacity is unknown; an estimation of the existing installation has been made: - 9 pieces air [...]
30/03/2017
5
Can you provide the brand and type of the existing CH pumps of the 2 existing groups?
The existing CH group radiators low rising building: Pump type Grundfos UMC 50-60 has sufficient capacity [...]
30/03/2017